Default Breakwater Repair

We have some ice damage to the end of our breakwater on Welch. Several large stone will have to be lifted out of the lake and reset.

We are looking for recommendations.

The last repair was by Winni Marine construction in 1996 and they did a good job back then. The only other contractor we know of in this business is Watermark. Suggestions would be appreciated.

Thanks
Slickcraft is offline   Reply With Quote
Old 03-28-2010, 09:22 AM   #2
Gatto Nero
Senior Member
 
Gatto Nero's Avatar
 
Join Date: May 2005
Location: Isola Gatto Nero
Posts: 696
Thanks: 162
Thanked 263 Times in 81 Posts
Default

I would try either Dave Farley at Diversified Marine 528-4151 or Jim Nagle at Lakes Region Marine 455-7101. Both are owner operators, good guys, come with good recommendations and, I found, much more reasonably priced than either Winni Marine or Watermark. When I was getting bids for my breakwater I called those two plus Winni and Watermark. Winni was the worst. I had to call several times before they even returned my call. They finally sent someone out to the site when I wasn't even there then sent me a one line quote that was double both Dave and Jim. I got the impression that they just didn't need or want my business. Watermark was responsive and professional but they came in real high as well.
__________________
La vita è buona su Isola Gatto Nero
Gatto Nero is offline   Reply With Quote
Old 03-28-2010, 09:53 AM   #3
ishoot308
Senior Member
 
Join Date: Feb 2008
Location: Gilford, NH / Welch Island
Posts: 5,961
Thanks: 2,298
Thanked 4,959 Times in 1,924 Posts
Default +1 for Dave Farley / Diversified

Slickcraft;

Dave Farley did some work for me last year at the camp and I was very happy with him. His prices were reasonable, he's a good guy and he showed up when he said he would. All in all a very good experience.

FWIW;

Dan
ishoot308 is offline   Reply With Quote
The Following User Says Thank You to ishoot308 For This Useful Post:
Sebago Dock (06-25-2012)
Old 03-28-2010, 01:11 PM   #4
Slickcraft
Senior Member
 
Join Date: Mar 2008
Location: Welch Island and West Alton
Posts: 3,232
Thanks: 1,180
Thanked 2,015 Times in 921 Posts
Default

Thanks Black Cat and 308, I'll make some calls tomorrow and try to get this started.
Slickcraft is offline   Reply With Quote
Old 03-28-2010, 02:34 PM   #5
Dock and Barge
Member
 
Join Date: Dec 2009
Posts: 29
Thanks: 1
Thanked 30 Times in 7 Posts
Default Dock and Barge

www.nedockandbarge.com
Dock and Barge is offline   Reply With Quote
Sponsored Links
Old 05-24-2010, 11:23 AM   #6
badger
Junior Member
 
Join Date: May 2010
Posts: 2
Thanks: 0
Thanked 0 Times in 0 Posts
Default

Black Diamond Barge Company, owned and operated by Jim Bean of Tuftonboro, now has two barges on the lake and do every aspect of landscaping, excavation, dock/breakwater and septics. Has reasonable prices and is very timely. Cell phone 455-5700 or Offic`e 569-4545
badger is offline   Reply With Quote
Old 05-24-2010, 02:44 PM   #7
4 for Boating
Senior Member
 
Join Date: Jan 2006
Posts: 211
Thanks: 1
Thanked 37 Times in 25 Posts
Default Watermark

Had a perched beach done some years ago by Watermark and was really impressed on how professional they were. Good equipment and able to solve problems.
4 for Boating is offline   Reply With Quote
Old 05-25-2010, 01:32 PM   #8
Grady223
Senior Member
 
Grady223's Avatar
 
Join Date: Apr 2004
Location: New Hope, PA & Barndoor Island
Posts: 464
Thanks: 93
Thanked 24 Times in 18 Posts
Default

I would only use Winni Marine - great work product.
Grady223 is offline   Reply With Quote
Old 05-25-2010, 02:04 PM   #9
Slickcraft
Senior Member
 
Join Date: Mar 2008
Location: Welch Island and West Alton
Posts: 3,232
Thanks: 1,180
Thanked 2,015 Times in 921 Posts
Default

In early May we did hire Dave Farley at Diversified Marine. The permit process should be about over and the work stated soon. Thanks for all the suggestions which no doubt were useful to others as well; there was a lot of damage to breakwaters and docks over the winter.
Slickcraft is offline   Reply With Quote
The Following User Says Thank You to Slickcraft For This Useful Post:
Sebago Dock (06-25-2012)
Reply

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -5. The time now is 05:19 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.

This page was generated in 0.24309 seconds