Who knows the route 104 repaving schedule, and good alternate routes?
I ran into that awful backup on 104 heading over to I93 last night just before 8:30. The backup cost me an extra half hour. I first thought they'd be using flag people to alternate E/W traffic over one lane, and that with more west bound traffic than east the delay wouldn't be too bad. I don't know what they were doing, but there were 10-15 minute intervals of going nowhere. In hindsight, I ought to have turned around and gone down Parade Road and to I93 that way, although I wondered how bad traffic dumping out of the Paugus Bay/Winnisquam onto route 11 would be. How long will this project run - anyone? |
![]() |
![]() |
![]() |
#2 |
Senior Member
Join Date: Oct 2004
Location: Alton
Posts: 1,908
Blog Entries: 1
Thanks: 533
Thanked 579 Times in 260 Posts
|
![]()
Here's the link to the NH DOT traffic report (511): HERE
Here's the info about the paving and schedule - looks like it's going on into mid/late August: Authorized the Department of Transportation to enter into a contract with C.L.H.. & Son, Inc of Auburn ME on the basis of a low bid for $475,340.49 for culvert replacement on I-93 in Ashland, NH Route 104 in Alexandria, NH Rte.11 in New London and NH Rte. 25 in Meredith from G&C approval through Aug. 14, 2009. 2) Further authorizing that a contingency in the amount of $47,534.05 be approved for payment of latent conditions, which may appear during construction of the project. 80% Federal Funds and 20% Highway Funds. |
![]() |
![]() |
![]() |
#3 |
Senior Member
Join Date: Apr 2008
Location: Moultonborough
Posts: 750
Thanks: 4
Thanked 259 Times in 171 Posts
|
![]()
Maps suggest a path from Rte 25 at Ctr Harbor to I93:
25B to Rte 3, south, then right onto Waukewan Road, to its end at Winona. Right on Winona, left onto Straits Road, follow to its end at Dana Hill Road. Left on Dana Hill, to Town House Road, right to its end at Rte 104 just east of Rte 132. How is Straits Road? The map suggests its a typical 30 mph minor back road. That's ok, if the alternative is sitting still on 104 for a half hour. |
![]() |
![]() |
![]() |
#4 | |
Senior Member
Join Date: Feb 2007
Location: Meredith
Posts: 725
Thanks: 25
Thanked 107 Times in 68 Posts
|
![]() Quote:
|
|
![]() |
![]() |
![]() |
#5 | |
Senior Member
Join Date: Apr 2008
Location: Southboro, MA
Posts: 579
Thanks: 75
Thanked 384 Times in 170 Posts
|
![]() Quote:
I am glad to hear they are half way done. |
|
![]() |
![]() |
Sponsored Links |
|
![]() |
#6 |
Senior Member
Join Date: Feb 2007
Location: Meredith
Posts: 725
Thanks: 25
Thanked 107 Times in 68 Posts
|
![]()
The section of 104 from Meredith Center Road to just shy of the 35 MPH section in New Hampton is complete (minus painting).
|
![]() |
![]() |
![]() |