Hello - so our swim dock broke free this week - luckily we were there and beached it before it took flight. Anyway we are looking for someone that can dive to install a new chain (some 12 feet) as the existing wore down and broke as they sometimes do from rubbing on the concrete mooring slab. We had this professionally done some 8 years ago by the Mooring Man/Trident but he has since retired according to his phone message. Any recommendations? (Meredith area). Thanks
|
|
|
|
|
|
#2 |
|
Senior Member
Join Date: Aug 2011
Location: Las Vegas, NV and Moultonborough, NH
Posts: 403
Thanks: 27
Thanked 96 Times in 80 Posts
|
We used Winnipesauke Island Services (Mike) for the exact same thing. Did a real nice job. Word of recommendation. Inspect/replace all of the hardware and replace with the chain with stainless.
|
|
|
|
|
|
#3 |
|
Senior Member
Join Date: Feb 2008
Location: Gilford, NH / Welch Island
Posts: 6,531
Thanks: 2,454
Thanked 5,465 Times in 2,142 Posts
|
Agree with DesertDweller, everything stainless!
Dan
__________________
It's Always Sunny On Welch Island!!
|
|
|
|
|
|
#4 |
|
Senior Member
Join Date: May 2005
Posts: 504
Thanks: 5
Thanked 173 Times in 90 Posts
|
Same thing happened to us during that crazy wind storm we had about a month ago (we live on windy point rd on long island). Bought chain at aubochon and sent my 39 yr old son down with a dive mask to reattach to the anchor. Amazingly, the wind actually pushed the 200 lb anchor over about 10 ft. We wern't here when it happened and the raft got jammed up against our neighbors breakwater destroying the raft ladder. That took some time to repair...
|
|
|
|
|
|
#5 |
|
Senior Member
Join Date: Aug 2013
Location: Bedford, NH; Meredith, NH
Posts: 1,006
Thanks: 264
Thanked 830 Times in 347 Posts
|
John Baxter, JB Dive Services in Gilford. He installed our mooring, checks the chain and hardware every years when he puts in the dock. Great guy.
|
|
|
|
| Sponsored Links |
|
|
|
|
#6 |
|
Senior Member
Join Date: Jul 2015
Location: weirs beach,
Posts: 311
Thanks: 39
Thanked 42 Times in 34 Posts
|
We also have used John , did a great job adding another concrete block to our mooring.
|
|
|
|
|
|
#7 |
|
Senior Member
Join Date: Jan 2006
Posts: 240
Thanks: 1
Thanked 41 Times in 28 Posts
|
Thanks! I fired an email off to John at JB Dive Services to see if he can help.
|
|
|
|
|
|
#8 |
|
Senior Member
Join Date: May 2020
Location: Belmont, NH
Posts: 194
Thanks: 2
Thanked 78 Times in 46 Posts
|
Since your chain is rubbing on the concrete slab and wearing out, you might want to make the first five feet a heavier gauge chain so it will hold up longer.
|
|
|
|
|
|