Does anyone know of post type foundation expert? I'm looking at an island property that has some possible foundation issues. Are there contractors out there that just do this sort of work or do general contractors just wing it?
I'm afraid in this case a DIY home builder winged it. It looks like there have been some erosion issues that have compromised the integrity of some of the concrete piers. |
![]() |
![]() |
![]() |
#2 |
Senior Member
Join Date: Jan 2006
Posts: 6,702
Thanks: 751
Thanked 1,454 Times in 1,011 Posts
|
![]()
Barry Caswell in Wolfeboro specializes in that.
|
![]() |
![]() |
![]() |
#3 |
Senior Member
Join Date: Jan 2005
Posts: 3,486
Thanks: 221
Thanked 810 Times in 486 Posts
|
![]()
Being on an island you are going to need someone that is equipped to handle island work, otherwise you will be eating barge charges.
What exactly needs to be done? Is it precast piers or sonotubes? Jack up, support and replace? I would contact Steve at ISS. |
![]() |
![]() |
![]() |
#4 |
Senior Member
Join Date: Jul 2011
Location: Mont Vernon NH & Big Barndoor Island
Posts: 321
Thanks: 4
Thanked 184 Times in 62 Posts
|
![]()
It's a odd place.... Someone built this huge deck for a house (actually a modest house, but decks on 4 sides and on 2 levels since the site is steep), but gave up before the house part. I think it's been sitting for a couple years now.
It's sonotube construction, but I fear the sonotubes are undersized and some are now tilted (maybe they weren't deep enough??? maybe they never started straight???). I hear the "building" failed inspection at this point and so it sits. I don't know what people do about erosion on steep lots, but I think it's been a serious issue in a couple places on this one. At least what stands today looks to be ok from a DES perspective. It's all 50+ feet from the water and no damage seems to have occurred in the 50 foot buffer area. Of course all building permits have expired now and the SPA rules have changed since it was started, so I'd guess I'm in for quite a lot of paperwork if I want to revive it. On the plus side it has a valid and state/town approved septic system. |
![]() |
![]() |
![]() |
#5 |
Senior Member
Join Date: Apr 2004
Location: Kuna ID
Posts: 2,755
Thanks: 246
Thanked 1,942 Times in 802 Posts
|
![]()
If the footings were sized correctly, enough were installed AND put in deep enough to be below the frost line then there shouldn't be any reason to see them moving. So something wasn't done right and therefore you're problem exists. Being on a steep grade with bad footings,
![]() Yeah you need to do your homework. Fixing the footings is the last of your concerns if what's there isn't grandfathered and you'd need to tear it down to meet current SPA guidelines. Since the building is partially finished could that be an issue? Dunno, but something I'd want to know right off the bat. |
![]() |
![]() |
Sponsored Links |
|
![]() |
#6 |
Senior Member
Join Date: May 2006
Location: Texas, Lake Ray Hubbard and NH, Long Island Winnipesaukee
Posts: 2,870
Thanks: 1,037
Thanked 892 Times in 524 Posts
|
![]()
Everyones comments are right on the Mark here.....
I think the big concern maybe, why are the piers failing. If it was a sano-tube installation, I would be concerned, that they where not installed down deep enough. Now that could be because the person doing the work didn't know any better, but it could also be because of ledge... you may find that correcting the issue gets $$$$ quick, if the digging isn't easy.... Was this place every complete? and was it ever issued an occupancy permit? If so grandfathering the structure shouldn't be much of a problem. However if the work was never completed, as outlined with the permits that have expired you could be looking at a bunch of paper work and legal costs.
__________________
Life is about how much time you can spend relaxing... I do it on an island that isn't really an island..... |
![]() |
![]() |
![]() |
#7 |
Senior Member
Join Date: Jan 2005
Posts: 3,486
Thanks: 221
Thanked 810 Times in 486 Posts
|
![]()
It sounds like a nightmare to me... Are you sure you want to get into it?
Take it from one who built on an island, it gets expensive quickly. Every little thing that needs to be barged costs you, labor costs tend to be higher, etc. |
![]() |
![]() |
![]() |
#8 | |
Senior Member
Join Date: Apr 2004
Location: Suncook, NH, but at The Lake at Heart
Posts: 2,615
Thanks: 1,082
Thanked 434 Times in 210 Posts
|
![]() Quote:
__________________
Just Sold ![]() At the lake the stress of daily life just melts away. Pro Re Nata |
|
![]() |
![]() |
![]() |
#9 | |
Senior Member
Join Date: Apr 2004
Location: Meredith/Naples Florida
Posts: 367
Thanks: 135
Thanked 50 Times in 26 Posts
|
![]() Quote:
I have a problem with rotted timbers under a cottage and looking for someone to fix the problem. |
|
![]() |
![]() |
![]() |
#10 |
Senior Member
Join Date: Jan 2010
Posts: 273
Thanks: 68
Thanked 76 Times in 52 Posts
|
![]()
sonotubes most commonly come in 4 ft lengths and should be placed in the ground the entire 4 ft length which is below the frost line. in your case the way your describing this issue they most likely hit ledge and stopped there leaving the rest of the sonotube sticking out of the ground. what should have been done after determining that it was ledge is called pinning. very common practice in New Hampshire. We use a powerfull hammer drill and drill into the ledge and then use rebar with an expoxy to hold done the post. also we would use 6x6 post. if your ready to do this project pm me. we are starting a 8 week project very soon. best of luck.
|
![]() |
![]() |
![]() |
#11 |
Senior Member
Join Date: Jul 2011
Location: Mont Vernon NH & Big Barndoor Island
Posts: 321
Thanks: 4
Thanked 184 Times in 62 Posts
|
![]()
We ran away and hid... We saw multiple Rattlesnake properties with this problem. We found one where the old piers had been pulled and replaced with 2 ft square pads that were probably only a foot thick... 3 guesses what happened to them too?
We're still working on our island purchase, but the one we're pretty close to buying has very nice 12" piers with between 6" and 12" sticking out of the ground. Of course we have no way of knowing how deep they are, but everything looks square and whoever built it had a pretty good idea which end of the hammer to hold. |
![]() |
![]() |
![]() |
#12 | |
Senior Member
Join Date: Apr 2004
Location: Kuna ID
Posts: 2,755
Thanks: 246
Thanked 1,942 Times in 802 Posts
|
![]() Quote:
Keep up the search, you'll find the right place. When I bought mine it was a no brainer soon as I looked under the building and did a quick walk around! It's so worth it once you got it. As many on here have told me in the past as I was going through the process, there is NOTHING like being out there on the island. Only problem I have now is not thinking about it during the week at work! |
|
![]() |
![]() |
![]() |
#13 |
Senior Member
Join Date: Apr 2007
Location: Maynard, MA & Paugus Bay
Posts: 2,573
Thanks: 753
Thanked 354 Times in 266 Posts
|
![]()
That is why the forum is here- Therapy for the work week!
__________________
Capt. of the "No Worries" |
![]() |
![]() |
The Following User Says Thank You to AC2717 For This Useful Post: | ||
MAXUM (08-22-2012) |
![]() |
#14 |
Senior Member
Join Date: Apr 2004
Posts: 87
Thanks: 1
Thanked 7 Times in 7 Posts
|
![]()
# 110 COW Is. In Orchard cove is for sale . Pretty flat lot !
|
![]() |
![]() |
![]() |
#15 |
Senior Member
Join Date: Jan 2005
Posts: 3,486
Thanks: 221
Thanked 810 Times in 486 Posts
|
![]() |
![]() |
![]() |
![]() |
#16 |
Senior Member
Join Date: Apr 2004
Posts: 87
Thanks: 1
Thanked 7 Times in 7 Posts
|
![]()
Private at present but will probably list soon. Be there 8-23 P.M. kc
|
![]() |
![]() |
![]() |
Bookmarks |
|
|