Looks like only one turn lane to rt 3 off of 25 when done. Back-ups will be the norm. http://www.meredith3-25.com/Document...l_Option_A.pdf
|
![]() |
![]() |
![]() |
#2 | |
Senior Member
Join Date: Sep 2008
Location: Meredith Bay & LI, NY
Posts: 3,222
Thanks: 1,219
Thanked 1,009 Times in 649 Posts
|
![]() Quote:
|
|
![]() |
![]() |
![]() |
#3 | |
Senior Member
Join Date: Apr 2004
Location: Moultonboro, NH
Posts: 2,927
Thanks: 476
Thanked 691 Times in 387 Posts
|
![]() Quote:
|
|
![]() |
![]() |
![]() |
#4 | |
Senior Member
Join Date: Feb 2004
Location: Center Harbor
Posts: 1,170
Thanks: 205
Thanked 434 Times in 251 Posts
|
![]() Quote:
|
|
![]() |
![]() |
![]() |
#5 |
Senior Member
Join Date: Jul 2007
Posts: 395
Thanks: 4
Thanked 26 Times in 24 Posts
|
![]()
I was thru there Monday and one lane was for left only other lane straight or right hand turn. This was clearly painted on the street. After you go through the lights there are still two lanes which merge into one. Maybe they changed since then and also the signage on the poles may show different.
Time to start going around. This will be a nightmare with one lane for left hand turn. Dave M |
![]() |
![]() |
Sponsored Links |
|
![]() |
#6 |
Senior Member
Join Date: Feb 2004
Location: Center Harbor
Posts: 1,170
Thanks: 205
Thanked 434 Times in 251 Posts
|
![]()
Laconia Daily Sun article here says "Work on the project will cease for the summer on June 8, ahead of Laconia Motorcycle Week activities, and will resume after Labor Day. Sperry said the road arrows and signs will go back up to resume the old traffic pattern for the summer."
Sperry is the New Hampshire Department of Transportation’s on-site contract administrator, and he should know what is going on. The article also says about the southbound turn lanes "the final project will retain those lanes", as also indicated on the project map previously referenced. They are still working this week and next and the rightmost lane will apparently be closed for work some of that time. |
![]() |
![]() |
![]() |
#7 |
Senior Member
Join Date: Aug 2009
Location: Moultonborough
Posts: 836
Thanks: 256
Thanked 672 Times in 243 Posts
|
![]()
The engineering plans posted on the NHDOT project web site CLEARLY show that when the project is done, the two lanes currently allowing folks to turn left from Rt25 West to Rt 3 South will be retained as before...no change. This is from the official engineering plans on line. Stop worrying....!
|
![]() |
![]() |
The Following User Says Thank You to tummyman For This Useful Post: | ||
pondguy (05-31-2018) |
![]() |
#8 |
Senior Member
Join Date: Aug 2013
Location: Hanover and Moultonborough
Posts: 89
Thanks: 7
Thanked 12 Times in 11 Posts
|
![]()
Yet the clock ticks.
|
![]() |
![]() |
![]() |
#9 |
Senior Member
Join Date: Nov 2010
Posts: 1,123
Thanks: 17
Thanked 342 Times in 207 Posts
|
![]()
I don't get what the state is doing.
Maybe someone who has been following this can explain this. Yes, I see new curbstones. I can understand new pipes under road. Why didn't the state schedule this for after Labor Day? Who or what entity makes these decisions? Name names. Other then the "state". |
![]() |
![]() |
![]() |
#10 |
Senior Member
Join Date: Feb 2004
Location: Center Harbor
Posts: 1,170
Thanks: 205
Thanked 434 Times in 251 Posts
|
![]()
As has already been explained, as of this Friday June 8th, construction will cease and all will be restored to the previous flow of traffic, including the option of turning left from both lanes coming to the light from Hannafords.
This information comes from Mr. Sperry, who is is the New Hampshire Department of Transportation’s on-site contract administrator AND from engineering plans available online. The summer traffic pattern will be pretty much the same as last summer, except perhaps for the new crosswalk location. AFTER Labor Day, construction will start again and, I assume, be completed before winter. Once the construction is finished, the traffic pattern will not be much different than it was except for the crosswalk. Why not do it all after Labor Day? Not enough time. So some was done in the spring and some after Labor Day. |
![]() |
![]() |
The Following 2 Users Say Thank You to jeffk For This Useful Post: | ||
KennyFromBoston (06-04-2018), ursa minor (06-03-2018) |
![]() |
#11 |
Senior Member
Join Date: Aug 2010
Location: Tuftonborough & Franklin MA
Posts: 265
Thanks: 99
Thanked 143 Times in 64 Posts
|
![]()
I think this will be better and safer once complete. It looks like the new crosswalk will have lighting, with the previous set up it could be very difficult to see people in the crosswalks at night.
__________________
" Any day with a boat ride in it is a good day" |
![]() |
![]() |
![]() |
#12 |
Senior Member
Join Date: Apr 2004
Location: Moultonborough
Posts: 2,893
Thanks: 334
Thanked 1,675 Times in 585 Posts
|
![]()
Am I understanding this correctly? All those months of work and a lot of money spent and nothing has changed except new curbs and a crosswalk.
|
![]() |
![]() |
The Following User Says Thank You to SAMIAM For This Useful Post: | ||
AC2717 (06-04-2018) |
![]() |
#13 | |
Senior Member
Join Date: Feb 2004
Location: Center Harbor
Posts: 1,170
Thanks: 205
Thanked 434 Times in 251 Posts
|
![]() Quote:
Except for the crosswalk, this doesn't seem to have been meant to be a "fix" for traffic issues. Mostly repairs to existing road/bridge/drainage systems. |
|
![]() |
![]() |
![]() |
#14 |
Senior Member
Join Date: Nov 2016
Location: Waltham Ma./Meredith NH
Posts: 4,112
Thanks: 2,221
Thanked 1,190 Times in 757 Posts
|
![]()
Does anyone know what's going on with the old hardware store building? It's starting to look pretty bad and should be torn down.
![]() |
![]() |
![]() |
![]() |
#15 |
Member
Join Date: Sep 2017
Posts: 39
Thanks: 5
Thanked 17 Times in 7 Posts
|
![]()
As it was explained to me :: The Old Hardware building and parking lot was bought by Rusty and the powers to be. A Three story building will be constructed there. 1st Floor will be retail shops.... 2nd floor will be offices... 3rd floor will be Condo's. I have heard this from a couple of people, So take it with a grain of salt.
|
![]() |
![]() |