Ok, I understand storms can be totally unpredictable. But this is now the second major storm where Moultonborough essentially had all its residents without power. This afternoon, a substantial number were back on line and to NHEC we all say thanks. BUT, it also seems to me that the BOS should invite NHEC in for a sit down to discuss why we seem to be having either transmission or substation issues. I recall that NHEC was going to do things to back feed services from two different directions to avoid these situations. Whatever happened seems to have not worked in this storm.
|
![]() |
![]() |