Go Back   Winnipesaukee Forum > Winnipesaukee Forums > General Discussion
Home Forums Gallery Webcams Blogs YouTube Channel Classifieds Calendar Register FAQDonate Members List Today's Posts

Reply
 
Thread Tools Display Modes
Old 09-23-2015, 12:37 PM   #1
VitaBene
Senior Member
 
VitaBene's Avatar
 
Join Date: Jul 2007
Location: Moultonborough
Posts: 3,585
Thanks: 1,618
Thanked 1,638 Times in 842 Posts
Default

Quote:
Originally Posted by MAXUM View Post
Does it matter when they are paving over a problem? That road will not last one spring thaw before it's a mess again. The whole thing needs to be ripped up and the road base fixed. Anything shy of that is futile.
Agreed, but until NH and it citizens decide that it is worthy of a multi-billion dollar bond to repair all of the Class 2 (mostly numbered secondary roads such as 25, 25B, 109, etc) they will never get fixed correctly. The state believes it is cheaper/better to pave and shim (which means skim coat and fill the shoulder with gravel) every few years.

Mass does the opposite, once they fix a road it is done right. Unfortunately it takes a long, long time to fix them!
VitaBene is offline   Reply With Quote
The Following User Says Thank You to VitaBene For This Useful Post:
ronc4424 (09-23-2015)
Old 10-03-2015, 06:18 AM   #2
fatlazyless
Senior Member
 
fatlazyless's Avatar
 
Join Date: Apr 2004
Posts: 8,747
Blog Entries: 1
Thanks: 300
Thanked 1,007 Times in 735 Posts
Default

Yesterday, Friday, Oct 2, the re-paving job began on the 4-mile long Meredith Neck Rd:

www.nh.gov/dot/

www.pikeindustries.com

www.continentalpaving.com

No Town of Meredith trucks or town employees, or local town police were present when I drove by so it is probably a State of NH project?
__________________
... down and out, liv'n that Walmart side of the lake!
fatlazyless is offline   Reply With Quote
Old 10-03-2015, 09:59 AM   #3
MDoug
Senior Member
 
Join Date: Dec 2006
Posts: 342
Thanks: 116
Thanked 42 Times in 39 Posts
Default meredith neckpaving

glad to see the pavers
if only a temporary fix, anything would be an improvement
MDoug is offline   Reply With Quote
Old 10-03-2015, 10:40 AM   #4
rick35
Senior Member
 
Join Date: Mar 2008
Location: Bear Island/Merrimack
Posts: 807
Thanks: 58
Thanked 203 Times in 130 Posts
Default

They probably had to wait until the season was over before doing the work so as to not cause traffic problems. I have exactly four more times that I will be on the Neck road this year so I will enjoy it before the heaves take over for next year. We're closing up the next two weekends and that will be it until April 23rd (ice out).
rick35 is offline   Reply With Quote
Reply

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -5. The time now is 05:07 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

This page was generated in 1.07622 seconds