![]() Quote:
Mass does the opposite, once they fix a road it is done right. Unfortunately it takes a long, long time to fix them! |
|
![]() |
![]() |
The Following User Says Thank You to VitaBene For This Useful Post: | ||
ronc4424 (09-23-2015) |
![]() |
#2 |
Senior Member
|
![]()
Yesterday, Friday, Oct 2, the re-paving job began on the 4-mile long Meredith Neck Rd:
www.nh.gov/dot/ www.pikeindustries.com www.continentalpaving.com No Town of Meredith trucks or town employees, or local town police were present when I drove by so it is probably a State of NH project?
__________________
... down and out, liv'n that Walmart side of the lake! |
![]() |
![]() |
![]() |
#3 |
Senior Member
Join Date: Dec 2006
Posts: 342
Thanks: 116
Thanked 42 Times in 39 Posts
|
![]()
glad to see the pavers
if only a temporary fix, anything would be an improvement |
![]() |
![]() |
![]() |
#4 |
Senior Member
Join Date: Mar 2008
Location: Bear Island/Merrimack
Posts: 807
Thanks: 58
Thanked 203 Times in 130 Posts
|
![]()
They probably had to wait until the season was over before doing the work so as to not cause traffic problems. I have exactly four more times that I will be on the Neck road this year so I will enjoy it before the heaves take over for next year. We're closing up the next two weekends and that will be it until April 23rd (ice out).
|
![]() |
![]() |
![]() |