Current HQ are failing. This project has been in the works for the past 3yrs +. Money has been allocated as well as federal grants I'm sure. Commercial buildings have a different set of specs for building than residential. And yes everything is now figured out with life expectancy. The 7.8 million is a budget. My guess is bids will come in lower, then generally do all depends on materials being used etc. and yes the budget is for all work, which includes demo and removal of the existing HQ. All things have a life expectancy, look at all the roads and bridges that were built no more than 50 yrs ago. Everything has a timeline. There will always be people that don't agree with spending money for something that has outlived its useful life. Renovating the current building is not an option due to the type of construction that is there (prestressed concrete panels and block) believe me when I say they need a new building.
Wreckn1 is offline  
The Following User Says Thank You to Wreckn1 For This Useful Post:
pjard (08-03-2014)
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -4. The time now is 07:59 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.

This page was generated in 0.21422 seconds