Default Take it down

All you have to do is look at it. No way would anyone want to try and repair that building. Must have something to do with insurance coverage.
RailroadJoe is offline   Reply With Quote
Old 03-17-2012, 01:29 PM   #2
no-engine
Senior Member
 
Join Date: Jul 2008
Location: West side Winnipesaukee, Lakes Region
Posts: 516
Thanks: 20
Thanked 52 Times in 40 Posts
Default

Building's condition appears worse in the last few days. I've seen now what appears to be a contractor's office trailer out back in the fenced in areas.

How can this family (Baldi) get away? News reports say that Lloyds insurance will not pay out while an investigation is on-going. I think it's unforgivable that Fire Marshals Office has not concluded. The weather has serious affects continually! I go by frequently. Guess what? There was no real conclusion made public to the fire that destroyed the former Lobster Pound Restaurant, maybe dozen years ago! Maybe this is similar??? Just total speculation. The same family owns drive in, and the colonial movie theatre in Laconia.

I have seen survey crews at the intersection just over the Weirs bridge. I speculate for the possible Roundabout. I have driven roundabouts in many places, smaller and larger than one in Meredith; I believe the State made a big mistake: the diameter should be a little larger! The waits get too long on the inbound roads.
no-engine is offline   Reply With Quote
Old 03-18-2012, 06:19 PM   #3
pm203
Senior Member
 
Join Date: Jul 2004
Posts: 225
Thanks: 41
Thanked 86 Times in 46 Posts
Default

Roundabout or rotary?
pm203 is offline   Reply With Quote
Old 03-18-2012, 06:34 PM   #4
upthesaukee
Senior Member
 
upthesaukee's Avatar
 
Join Date: Jan 2003
Location: Alton Bay
Posts: 5,597
Blog Entries: 2
Thanks: 2,455
Thanked 1,979 Times in 1,080 Posts
Default roundabout

not enough room for a rotary.
__________________
I Live Here... I am always UPTHESAUKEE !!!!
upthesaukee is offline   Reply With Quote
Old 03-18-2012, 08:52 PM   #5
fatlazyless
Senior Member
 
fatlazyless's Avatar
 
Join Date: Apr 2004
Posts: 8,740
Blog Entries: 1
Thanks: 300
Thanked 1,007 Times in 735 Posts
Default

From memory, as best I recall, the roundabout in Meredith is 120' diameter, and the Weirs roundabout which is to be built this year will be 110' in diameter.......or something like that.

And, a small piece of the former Karl's Fine Food parking lot will be used for the roundabout.


That vacant lot has been for sale for maybe five years now.


"Drastically Reduced" is what the real estate sales sign says on a property for sale that is close to the Cumberland Farm store......everytime I see that sign......it makes me giggle....."Drastically Reduced"
__________________
... down and out, liv'n that Walmart side of the lake!
fatlazyless is offline   Reply With Quote
Sponsored Links
Old 03-19-2012, 07:44 AM   #6
Winnisquamguy
Senior Member
 
Winnisquamguy's Avatar
 
Join Date: Dec 2010
Location: Winnisquam, NH
Posts: 613
Thanks: 419
Thanked 163 Times in 115 Posts
Default

The Meredith roundabout about is 130' and the new one in the Weirs will be 120' you can find more information here.http://www.nh.gov/dot/projects/lacon...june310_cr.pdf
__________________
"I'd rather be ridin than rolling"
Winnisquamguy is offline   Reply With Quote
Old 03-19-2012, 08:11 AM   #7
AC2717
Senior Member
 
AC2717's Avatar
 
Join Date: Apr 2007
Location: Maynard, MA & Paugus Bay
Posts: 2,574
Thanks: 753
Thanked 354 Times in 266 Posts
Default

I know I am pushing this more off topic, and I am sorry, but I just hope they do not plan on doing this work this spring and summer
__________________
Capt. of the "No Worries"
AC2717 is offline   Reply With Quote
Old 03-19-2012, 08:59 AM   #8
dragonfly03246
Senior Member
 
Join Date: Sep 2008
Posts: 83
Thanks: 7
Thanked 29 Times in 15 Posts
Default Work starting soon

The signs are up and the pavement's been marked. They plan on starting construction next month.
dragonfly03246 is offline   Reply With Quote
Old 03-19-2012, 04:23 PM   #9
Belmont Resident
Senior Member
 
Belmont Resident's Avatar
 
Join Date: Apr 2004
Location: Belmont NH but prefer Jackman Maine
Posts: 1,857
Thanks: 491
Thanked 410 Times in 251 Posts
Default Sorry

I cannot see anything good coming from this project.
Except it should have traffic backed up all the way to Shaws during bike weekend.
__________________
"better to have a short life that is full of what you like doing, then a long life spent in a miserable way.."
Belmont Resident is offline   Reply With Quote
Reply

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -5. The time now is 01:01 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

This page was generated in 0.79395 seconds