Go Back   Winnipesaukee Forum > Blogs > Broome Building Co.
Home Forums Gallery Blogs YouTube Channel Classifieds Links Calendar Register FAQDonate Members List Search Today's Posts Mark Forums Read

» Site Navigation
» Quiz
» WeirsCAM
» Articles - Information
» Recent Forum Threads
Happy 4th of July
Today 12:57 PM
Last post by Top-Water
Today 05:30 PM
3 Replies, 144 Views
Moultonborough Town...
06-19-2020 08:27 AM
Last post by longislander
Today 04:54 PM
69 Replies, 3,598 Views
Illegal Rafting...
Yesterday 12:14 PM
Last post by thinkxingu
Today 03:44 PM
16 Replies, 1,027 Views
2020 4th Fireworks
06-19-2020 01:08 PM
Last post by thinkxingu
Today 01:44 PM
11 Replies, 2,369 Views
What am I in for?
Today 01:40 PM
Last post by Juiced06GTO
Today 01:40 PM
0 Replies, 126 Views
» Made in USA
Rate this Entry

Geothermal Design - Installation

Submit "Geothermal Design - Installation" to Facebook Submit "Geothermal Design - Installation" to Digg Submit "Geothermal Design - Installation" to Google Submit "Geothermal Design - Installation" to Twitter
Posted 10-13-2011 at 06:56 AM by Broome Building Co.
Updated 10-14-2011 at 07:55 PM by Broome Building Co.

When considering the installation of a new heating system give geothermal a look. With today's federal and local rebates, it can actually cost less to go with a geothermal heating system rather than the best propane or oil system. Benefits include minimal reliance on fossil fuels, cleanest energy available and a typical fuel savings annually of 50%.


To give those interested a better understanding of Geothermal Heating, I have decided to offer a look into this technology and its benefits. The featured home is a new 2 story, 1800 square foot home being constructed with optimum energy efficiency in mind here in the Lakes Region.

Step 1. System Design: The design of a geothermal heating system is specific to each individual home. Windows, doors, insulation r-values and the building envelope are important features to consider when designing a system.


Design Summary: Lakes Region Home

Design Data:

Heating Load: 37,500 Btuh

Heating Temp Diff: 65.0 F

Cooling Load: 24,000 Btuh

Cooling Temp Diff: 20.0 F

Constant Fan: No

Design City: GREEN BAY, WI

Winter Design: -9 F

Summer Design: 88 F


Comfort Conditions:

Heating Setpoint: 60 F

Cooling Setpoint: 72 F

Start Cooling Temp: 72 F


Annual Load:

Heating: 58.5 million Btu

Cooling: 12.0 million Btu


Performance Summary


Heating Electrical Use: 4,768 kWh

Cooling Electrical Use: 355 kwh

Estimated annual energy use: $1262.00


As the installation progresses, I will post photos of Step 2. The Installation, to this Blog
Posted in Uncategorized
Share Views 4224 Comments 0
« Prev     Main     Next »
Total Comments 0

Comments

 

Powered by vBadvanced CMPS v3.2.3

All times are GMT -4. The time now is 06:41 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2020, vBulletin Solutions Inc.

This page was generated in 0.31071 seconds