Default Builder Needed for Out Building in Tuftonboro

I have a designed and permitted out building (small workshop and one-bay boat space) and I'm trying to get a builder to build it. I don't have an urgent timetable, but want it done by next summer. Located in Tuftonboro. It's probably 2 weeks of work for 2 people.

I've had trouble getting my contacts returned, or getting quotes. I'm willing to pay a fair price for a good job.

Any referrals to someone who would do the job? Thanks in advance.
chocophile is offline   Reply With Quote
Old 08-28-2023, 02:44 PM   #2
MeredithMan
Senior Member
 
MeredithMan's Avatar
 
Join Date: Aug 2013
Location: Bedford, NH; Meredith, NH
Posts: 864
Thanks: 233
Thanked 768 Times in 302 Posts
Default It's not easy...

I am looking to have my entire deck replaced. It's a sizeable job and it has been horrible getting quotes. People come out and look and set the expectation that a quote will be forthcoming in a "week or two" and I never hear from them. One contractor told me he couldn't even touch it for 15 months from now, so he didn't even come out.

Two folks that have provided prices and seem reasonable to deal with are Scott Compton Builders and the construction crew of Stephens Landscaping, (yes, they have a legit carpentry/construction crew now). Even though I have quotes, neither of them can touch it till sometime late Spring, 2024.
MeredithMan is offline   Reply With Quote
Old 08-28-2023, 03:00 PM   #3
Biggd
Senior Member
 
Join Date: Nov 2016
Location: Waltham Ma./Meredith NH
Posts: 3,752
Thanks: 1,966
Thanked 1,071 Times in 676 Posts
Question

One of my neighbors in Meredith is having a new home built. He hired the builder over a year ago. They started about a month ago and said it would be a year to completion. It was raining lightly Friday and no one showed up, nor Saturday or Sunday?
Being from Mass I'm just not use to this. They put new homes up here in less than 6 months. Most crews work at least 6 days a week with some working Sundays also, rain or shine.
Biggd is offline   Reply With Quote
Old 08-28-2023, 03:04 PM   #4
WinnisquamZ
Senior Member
 
WinnisquamZ's Avatar
 
Join Date: Dec 2016
Posts: 1,896
Thanks: 193
Thanked 595 Times in 400 Posts
Default

Will tell you it was 25 months to complete our recent kitchen/bath remodel. From the first email to returning of the key


Sent from my iPhone using Winnipesaukee Forum mobile app
WinnisquamZ is offline   Reply With Quote
Old 08-28-2023, 03:13 PM   #5
Biggd
Senior Member
 
Join Date: Nov 2016
Location: Waltham Ma./Meredith NH
Posts: 3,752
Thanks: 1,966
Thanked 1,071 Times in 676 Posts
Default

Quote:
Originally Posted by WinnisquamZ View Post
Will tell you it was 25 months to complete our recent kitchen/bath remodel. From the first email to returning of the key


Sent from my iPhone using Winnipesaukee Forum mobile app
For just a kitchen/bath remodel?
I know Covid put a damper on materials but they are still building homes in Mass pretty quickly.
Biggd is offline   Reply With Quote
Sponsored Links
Old 08-28-2023, 03:59 PM   #6
WinnisquamZ
Senior Member
 
WinnisquamZ's Avatar
 
Join Date: Dec 2016
Posts: 1,896
Thanks: 193
Thanked 595 Times in 400 Posts
Default

Yup. Around the lakes region the good ones are booked two years out. Worth waiting for


Sent from my iPhone using Winnipesaukee Forum mobile app
WinnisquamZ is offline   Reply With Quote
Old 08-28-2023, 04:35 PM   #7
John Mercier
Senior Member
 
Join Date: Jun 2021
Posts: 2,983
Thanks: 2
Thanked 529 Times in 435 Posts
Default

Quote:
Originally Posted by chocophile View Post
I have a designed and permitted out building (small workshop and one-bay boat space) and I'm trying to get a builder to build it. I don't have an urgent timetable, but want it done by next summer. Located in Tuftonboro. It's probably 2 weeks of work for 2 people.

I've had trouble getting my contacts returned, or getting quotes. I'm willing to pay a fair price for a good job.

Any referrals to someone who would do the job? Thanks in advance.
Who have you tried so I do not repeat the work you've already put in.
I may have some on our list that you didn't seek out yet.
John Mercier is offline   Reply With Quote
Old 08-28-2023, 06:10 PM   #8
John Mercier
Senior Member
 
Join Date: Jun 2021
Posts: 2,983
Thanks: 2
Thanked 529 Times in 435 Posts
Default

Quote:
Originally Posted by MeredithMan View Post
I am looking to have my entire deck replaced. It's a sizeable job and it has been horrible getting quotes. People come out and look and set the expectation that a quote will be forthcoming in a "week or two" and I never hear from them. One contractor told me he couldn't even touch it for 15 months from now, so he didn't even come out.

Two folks that have provided prices and seem reasonable to deal with are Scott Compton Builders and the construction crew of Stephens Landscaping, (yes, they have a legit carpentry/construction crew now). Even though I have quotes, neither of them can touch it till sometime late Spring, 2024.
Are you willing to wait, or do you need more names?
Both of them would be a decent choice, and I'm not sure that we could find anyone that would be sooner, but I could supply more names if that timeline doesn't work for you.
John Mercier is offline   Reply With Quote
Old 08-28-2023, 06:29 PM   #9
Woody38
Senior Member
 
Join Date: May 2016
Posts: 564
Thanks: 46
Thanked 104 Times in 75 Posts
Default

We did a complete tear down of the kitchen, laundry and powder room prior to covid. Got rid of the fiberboard builder stuff the previous owner had when the house was built. This took one month start to finish and we thought that was a long time. How things change.

________________________________

I am a retires workaholic and continuing aquaholic
Woody38 is offline   Reply With Quote
Old 08-28-2023, 07:41 PM   #10
John Mercier
Senior Member
 
Join Date: Jun 2021
Posts: 2,983
Thanks: 2
Thanked 529 Times in 435 Posts
Default

I think most brands of higher end kitchen cabinets are still out about 20 weeks plus shutdowns for holidays.
Really a winter kitchen remodel should be started in June, and on-site will be in the winter.
John Mercier is offline   Reply With Quote
Old 08-31-2023, 01:38 AM   #11
SAB1
Senior Member
 
Join Date: Feb 2012
Location: Tuftonboro
Posts: 1,165
Thanks: 182
Thanked 297 Times in 220 Posts
Default

Quote:
Originally Posted by WinnisquamZ View Post
Yup. Around the lakes region the good ones are booked two years out. Worth waiting for


Sent from my iPhone using Winnipesaukee Forum mobile app
This. Very tough and it’s been this way awhile.
SAB1 is offline   Reply With Quote
Old 08-31-2023, 08:16 AM   #12
bobkatfly
Senior Member
 
bobkatfly's Avatar
 
Join Date: Aug 2015
Location: Mirror Lake/Winter Harbor
Posts: 303
Thanks: 47
Thanked 49 Times in 43 Posts
Default

Quote:
Originally Posted by SAB1 View Post
This. Very tough and it’s been this way awhile.
Yeah, it has.

Ive been trying to get someone to replace a skylight on a low 6 pitch roof for almost a year. Didn't want to do it myself because I'm currently renovating another house and thought it could be an easy one or two day "filler" job for someone. Called five contractors, two showed up to look. Never heard back. Really need to have it done before the winter so I'm starting it myself today.
Very surprised by all this, especially for a relatively small job.

Want to say thanks to John M. for his recommendations. Wish it had worked out better, though.
__________________
Bob F

Amherst till the big 66 comes (made it!)
Winter Harbor/Mirror Lake till the big guy comes
bobkatfly is offline   Reply With Quote
Old 08-31-2023, 11:16 AM   #13
John Mercier
Senior Member
 
Join Date: Jun 2021
Posts: 2,983
Thanks: 2
Thanked 529 Times in 435 Posts
Default

Its actually very tough on that side of the lake.

They are all going after some very high end jobs that take months to complete.

I remember around 2016/17 when a lot of these younger contractors just entered the field. Well trained from the local high school programs that we had, but developing more skill in the field working on the older structures that could have various building techniques and components through the eras. Now they are all crewed up and doing large new builds and renovations.

In Bristol, I still have more options on handypersons that do small jobs, but to travel to the other side of the lake becomes problematic.
John Mercier is offline   Reply With Quote
Old 08-31-2023, 12:46 PM   #14
codeman671
Senior Member
 
codeman671's Avatar
 
Join Date: Jan 2005
Posts: 3,360
Thanks: 210
Thanked 764 Times in 448 Posts
Default

Quote:
Originally Posted by bobkatfly View Post
Yeah, it has.

Ive been trying to get someone to replace a skylight on a low 6 pitch roof for almost a year. Didn't want to do it myself because I'm currently renovating another house and thought it could be an easy one or two day "filler" job for someone. Called five contractors, two showed up to look. Never heard back. Really need to have it done before the winter so I'm starting it myself today.
Very surprised by all this, especially for a relatively small job.

Want to say thanks to John M. for his recommendations. Wish it had worked out better, though.
Do you have the skylight? I have an island focused crew that I am helping to get established, but could possibly have them squeeze it in as a filler. Simple time and materials project by the sound of it. They are working on my place now but would be available within the next few weeks at most to do it if you have the skylight.
codeman671 is offline   Reply With Quote
Old 08-31-2023, 03:32 PM   #15
sky's
Senior Member
 
Join Date: Jan 2010
Posts: 250
Thanks: 55
Thanked 61 Times in 44 Posts
Default

the estimating process needs to change. for some contractors or i should say good contractors with 10+ years experience should have a fairly close idea or a "ballpark" of the cost of the job. yes nothing is etched in stone like rot repair for for example. but the contractor has to ask "what is your budget?" from there both parties have to explain yes sir i think we can make that work or sorry i think were off on that budget. estimates take hours and sometimes days to put together its not like selling a tv or a new toaster. its a service we provide along with other sub contractors at times and this stuff takes time. for myself i try to disclose a ballpark up front and also ask the customer to provide a budget. if the customer refuses to disclose a budget than we will not proceed with the estimate process. for myself im 55 yrs old 20 years a contractor in the Lakes Region and this process has to change for both parties. Good luck to the gentlemen in Tuftonboro if your still stuck feel free to call me 603-254-4151
sky's is offline   Reply With Quote
The Following User Says Thank You to sky's For This Useful Post:
Lesdeak (12-23-2023)
Old 08-31-2023, 04:12 PM   #16
WinnisquamZ
Senior Member
 
WinnisquamZ's Avatar
 
Join Date: Dec 2016
Posts: 1,896
Thanks: 193
Thanked 595 Times in 400 Posts
Default

Interesting take. Why can’ estimates be completed with a video phone call and photos. Ballpark the job based off assumptions. If those assumptions change the price changes. Must say as a 20 plus year lakefront property owner sometimes contractor estimates are based on “ he owns a lakefront home bump it up”


Sent from my iPhone using Winnipesaukee Forum mobile app
WinnisquamZ is offline   Reply With Quote
Old 08-31-2023, 08:44 PM   #17
TheTimeTraveler
Senior Member
 
Join Date: Aug 2015
Posts: 818
Thanks: 258
Thanked 259 Times in 157 Posts
Default

Isn't $150 per square foot (on average) a good figure to go with these days?

I realize some variations due to various situations......
TheTimeTraveler is offline   Reply With Quote
Old 08-31-2023, 08:46 PM   #18
John Mercier
Senior Member
 
Join Date: Jun 2021
Posts: 2,983
Thanks: 2
Thanked 529 Times in 435 Posts
Default

He is making a ballpark on assumptions.
He is upset with a customer that doesn't want to disclose their budget.
It wastes time in our quoting; and for a contractor that is the ''kiss of death''.
John Mercier is offline   Reply With Quote
Old 09-01-2023, 04:20 AM   #19
tis
Senior Member
 
tis's Avatar
 
Join Date: Jan 2006
Posts: 6,411
Thanks: 719
Thanked 1,381 Times in 957 Posts
Default

Quote:
Originally Posted by TheTimeTraveler View Post
Isn't $150 per square foot (on average) a good figure to go with these days?

I realize some variations due to various situations......
I think it would be a miracle to build even a small house now for that kind of mon ey.
tis is online now   Reply With Quote
Old 09-01-2023, 06:09 AM   #20
codeman671
Senior Member
 
codeman671's Avatar
 
Join Date: Jan 2005
Posts: 3,360
Thanks: 210
Thanked 764 Times in 448 Posts
Default

Quote:
Originally Posted by TheTimeTraveler View Post
Isn't $150 per square foot (on average) a good figure to go with these days?

I realize some variations due to various situations......
Years ago…
codeman671 is offline   Reply With Quote
Old 09-01-2023, 07:46 AM   #21
bobkatfly
Senior Member
 
bobkatfly's Avatar
 
Join Date: Aug 2015
Location: Mirror Lake/Winter Harbor
Posts: 303
Thanks: 47
Thanked 49 Times in 43 Posts
Default Thanks Codeman

Quote:
Originally Posted by codeman671 View Post
Do you have the skylight? I have an island focused crew that I am helping to get established, but could possibly have them squeeze it in as a filler. Simple time and materials project by the sound of it. They are working on my place now but would be available within the next few weeks at most to do it if you have the skylight.
I have the light but already into it and should be done today. Wish we could have talked early on. Thanks for the offer though.
__________________
Bob F

Amherst till the big 66 comes (made it!)
Winter Harbor/Mirror Lake till the big guy comes
bobkatfly is offline   Reply With Quote
Old 09-03-2023, 12:29 PM   #22
John Mercier
Senior Member
 
Join Date: Jun 2021
Posts: 2,983
Thanks: 2
Thanked 529 Times in 435 Posts
Default

Quote:
Originally Posted by TheTimeTraveler View Post
Isn't $150 per square foot (on average) a good figure to go with these days?

I realize some variations due to various situations......
You would need to be very careful on your design and product choices.

Studs and sheetrock are relatively cheap... and a bigger home would cost less per square foot based on those. But windows, doors, siding, and other ''finishes'' can really add up.


The higher series has more options, and because of the aluminum cladding can get a 20 year paint warranty. But not every build needs that.
John Mercier is offline   Reply With Quote
Old 09-25-2023, 05:25 PM   #23
aydinlik
Member
 
Join Date: Nov 2018
Posts: 42
Thanks: 40
Thanked 4 Times in 3 Posts
Default

I have been talking to contractors about adding another story to my home. The cheapest price so far is around 350$/square ft. I even got a quote for 700$/square feet. All basic second floor with 3 bedrooms and a bathroom. I bought my home 5 years a go. If I pay 350$/sqft for the addition I will be paying more than price I paid for the place.
aydinlik is offline   Reply With Quote
Old 09-25-2023, 06:43 PM   #24
John Mercier
Senior Member
 
Join Date: Jun 2021
Posts: 2,983
Thanks: 2
Thanked 529 Times in 435 Posts
Default

Demo for tearing a roof off is one cost, and the addition needs electrical, plumbing, HVAC... about the only thing not happening is a new kitchen.

Have you thought of trying to re-imagine your space within the same footprint and shell?
John Mercier is offline   Reply With Quote
Old 09-25-2023, 08:06 PM   #25
aydinlik
Member
 
Join Date: Nov 2018
Posts: 42
Thanks: 40
Thanked 4 Times in 3 Posts
Default

Quote:
Originally Posted by John Mercier View Post
Demo for tearing a roof off is one cost, and the addition needs electrical, plumbing, HVAC... about the only thing not happening is a new kitchen.

Have you thought of trying to re-imagine your space within the same footprint and shell?
Thanks for the great advice. I think we need to do that. May be looking at the basement to see if we can get extra space from there.
aydinlik is offline   Reply With Quote
Old 09-26-2023, 10:03 AM   #26
sky's
Senior Member
 
Join Date: Jan 2010
Posts: 250
Thanks: 55
Thanked 61 Times in 44 Posts
Default

Quote:
Originally Posted by aydinlik View Post
Thanks for the great advice. I think we need to do that. May be looking at the basement to see if we can get extra space from there.
whenever youre adding a bathroom it ads up fast. basement you'll probably need an ejector pump unless you have the head room to do a step up into the shower for example. good luck
sky's is offline   Reply With Quote
Old 09-26-2023, 11:08 AM   #27
FlyingScot
Senior Member
 
Join Date: Jun 2016
Location: Tuftonboro and Sudbury, MA
Posts: 2,210
Thanks: 1,112
Thanked 935 Times in 577 Posts
Default

Having had finished third floors and also finished basements at different times, we have found finished third floors get much more use--the light and sense of privacy is often much better. OTOH, a finished basement has easier access to outside. So it's a matter of taste and specific need, but I would not describe them as an even trade off
FlyingScot is offline   Reply With Quote
Old 09-26-2023, 04:34 PM   #28
aydinlik
Member
 
Join Date: Nov 2018
Posts: 42
Thanks: 40
Thanked 4 Times in 3 Posts
Default

Quote:
Originally Posted by FlyingScot View Post
Having had finished third floors and also finished basements at different times, we have found finished third floors get much more use--the light and sense of privacy is often much better. OTOH, a finished basement has easier access to outside. So it's a matter of taste and specific need, but I would not describe them as an even trade off
I agree. We also prefer to add the second story. However It doesn't make any financial sense with these prices. Contractors are very busy and material shortages are still a big problem. One contractor told us that it is hard to get hardwood floors these days.

I also see that there are more contractors available for interior work such as finishing the basements. Many companies don't want to do structural work and framing.
aydinlik is offline   Reply With Quote
Old 09-26-2023, 04:40 PM   #29
aydinlik
Member
 
Join Date: Nov 2018
Posts: 42
Thanks: 40
Thanked 4 Times in 3 Posts
Default

Quote:
Originally Posted by sky's View Post
whenever youre adding a bathroom it ads up fast. basement you'll probably need an ejector pump unless you have the head room to do a step up into the shower for example. good luck
According to contractors the biggest item is structural. Using different material for bathrooms makes some difference but not very significant.
aydinlik is offline   Reply With Quote
Old 09-26-2023, 04:45 PM   #30
aydinlik
Member
 
Join Date: Nov 2018
Posts: 42
Thanks: 40
Thanked 4 Times in 3 Posts
Default

Can anyone recommend some names for me as well for the second story addition project? The project is not urgent so i can wait.
aydinlik is offline   Reply With Quote
Old 09-26-2023, 07:40 PM   #31
John Mercier
Senior Member
 
Join Date: Jun 2021
Posts: 2,983
Thanks: 2
Thanked 529 Times in 435 Posts
Default

I'm a bit confused. I thought you posted that you have had contractors bid on the second story addition, but didn't like the pricing; so it sounds like you have access to contractors. Why more names?
John Mercier is offline   Reply With Quote
Old 09-28-2023, 11:02 AM   #32
MorelloConstruction
Junior Member
 
Join Date: Sep 2023
Posts: 2
Thanks: 0
Thanked 0 Times in 0 Posts
Default Lakes Region Construction

Hello
My name is Nate Morello. My company is Morello Construction Inc. Specializing in Custom Homes, Additions, Site Excavation, and Septic Systems. We work in the lakes region specifically on shoreline projects and island projects.
If you want to email me some information I would be happy to take a look at your project for you.
morelloconstruction@comcast.net
MorelloConstruction is offline   Reply With Quote
Reply

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -5. The time now is 05:03 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.

This page was generated in 0.30750 seconds