Go Back   Winnipesaukee Forum > Winnipesaukee Forums > General Discussion
Home Forums Gallery Webcams Blogs YouTube Channel Classifieds Calendar Register FAQDonate Members List Today's Posts

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 06-04-2013, 04:53 PM   #10
Lakegeezer
Senior Member
 
Join Date: Feb 2003
Location: Moultonboro, NH
Posts: 1,658
Blog Entries: 1
Thanks: 343
Thanked 620 Times in 279 Posts
Default There are some problems

The Moultonborough town boards will take up the issue of the unauthorized building sometime later this month. There was no building permit, it appears to be built in violation of the steep slope ordinance and there was over 30,000 square feet of trees clear cut, another steep slope violation. There may be other issues. It is on the published zoning board's agenda for June 5'th and planning board agenda for June 12'th. Either or both could be postponed.
__________________
-lg
Lakegeezer is offline   Reply With Quote
The Following 3 Users Say Thank You to Lakegeezer For This Useful Post:
ApS (06-04-2013), Heaven (06-04-2013), Rusty (06-04-2013)
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -5. The time now is 01:58 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.

This page was generated in 0.78603 seconds