Post Dock Permits and Replacement?

I bought a home on the lake about 1.5 years ago but have been coming up my whole life. The home has 150' of waterfront with a L shaped dock in a smaller cove. The dock may have a few years left in it but is at the end of its life cycle.

What are my options to replace it? I would like to modify it to a T shape if possible so that the boat would not sit below a dirty pine tree. Over the years I have heard many difficult stories regarding dock permits. Are these old wise tales or is there some truth?

What is the process to go about amending my current dock plan and preparing for an eventual replacement? With all the frontage, the fact that it would not affect my neighbors, and it would still protrude from the same spot on the property, I can not see why it would raise any issues.

Thank you for all your help. This forum has been a great resource for me over the last couple years. Can't wait for summer!
boccebay is offline   Reply With Quote
Old 04-15-2015, 11:18 AM   #2
Jersey Ed
Member
 
Join Date: Oct 2014
Posts: 24
Thanks: 231
Thanked 1 Time in 1 Post
Default

Boccebay have you tried to do a search on here as questions like this have been asked many times??
Jersey Ed is offline   Reply With Quote
Old 04-15-2015, 11:23 AM   #3
boccebay
Junior Member
 
Join Date: Apr 2015
Posts: 3
Thanks: 5
Thanked 0 Times in 0 Posts
Default

I have searched but was unable to come up with much relating to a reconfiguration. I found some information on 40' straight docks and some people asking about U docks being grandfathered in. Perhaps I missed it. Please share a link if you know of an existing thread.
boccebay is offline   Reply With Quote
Old 04-15-2015, 12:12 PM   #4
BroadHopper
Senior Member
 
BroadHopper's Avatar
 
Join Date: Oct 2004
Location: Laconia NH
Posts: 5,509
Thanks: 3,116
Thanked 1,089 Times in 783 Posts
Default

http://des.nh.gov/organization/divis...sonal-dock.htm

The law only allows for a single 6 feet wide, and 40 feet long dock on lakes over 1,000 acres or larger, or no more than 6 feet wide and 30 feet long on water bodies that are less than 1,000 acres in size.

Existing docks configurations are grandfathered.
__________________
Someday may never be an actual day.
BroadHopper is offline   Reply With Quote
The Following 2 Users Say Thank You to BroadHopper For This Useful Post:
boccebay (04-15-2015), Misha888 (04-17-2015)
Old 04-15-2015, 02:04 PM   #5
tummyman
Senior Member
 
Join Date: Aug 2009
Location: Moultonborough
Posts: 780
Thanks: 233
Thanked 631 Times in 228 Posts
Default

Not True in my opinion....you are allowed to have more dock space for every 75 ft of added frontage. See below:

Env-Wt 402.13 Frontage Over 75'. To lessen congestion, improve public safety and navigation, protect neighboring property values, provide sufficient area for construction of facilities, provide adequate area for boat maneuvering, and protect health, safety, and general welfare, there shall be a minimum of 75' of shoreline frontage on the property for the first 2-slip structure and an additional 75' of shoreline frontage on the property for each additional boating slip or securing location on a structure for non-commercial use. This section shall not be interpreted to prevent construction of a dock on lots with less than 75' of shoreline frontage as provided in Env-Wt 402.12.

As a result, if you have at least 150 ft of frontage, measured as the average between a straight line between your pins and the waterfront frontage at the high lake level, then you can apply for a permit to have a third slip. this allows for a "U" shaped configuration, etc. So 150 ft would allow for three slips, 225 ft would allow for four slips, etc. Need to file with DES as a Standard Dredge and Fill permit...not a the seasonal dock notification application. They are two different things.
tummyman is offline   Reply With Quote
Sponsored Links
Old 04-15-2015, 06:52 PM   #6
TiltonBB
Senior Member
 
Join Date: Feb 2005
Location: Gilford, NH and Florida
Posts: 2,895
Thanks: 643
Thanked 2,153 Times in 900 Posts
Default Call Them

It may have a lot to do with what is already there. If you are trying to replace the existing dock wth a dock of the same square footage, just a different configuration, you may be able to.

I would call DES in Concord and tell them what your situation is. They have someone assigned to answer telephone inquiries and in the past they have been very helpful when I called.
TiltonBB is offline   Reply With Quote
Old 04-15-2015, 07:02 PM   #7
tis
Senior Member
 
tis's Avatar
 
Join Date: Jan 2006
Posts: 6,405
Thanks: 719
Thanked 1,379 Times in 955 Posts
Default

They do not like u shaped docks. If you have one you can still have one but they discourage it.
tis is offline   Reply With Quote
Old 04-15-2015, 08:00 PM   #8
pontoonbarge
Member
 
pontoonbarge's Avatar
 
Join Date: Jan 2008
Location: Windham, NH
Posts: 42
Thanks: 86
Thanked 18 Times in 9 Posts
Default DES meeting

Hi -- I suggest you give DES a call. A meeting with them is really helpful. I did that last year, and could ask all my questions and find out what might work out best for our lot.

Ahead of time I thought it'd be an intimidating meeting, but it wasn't at all. Met with one very helpful person who even sketched out a possibility for me.

After that is getting the permit application together. Town Halls in the area have examples. There's an easy form, and a hard form. Carefully review the online guidelines on the DES page. (By 'hard' i mean lengthy... but you can do it. 1 step at a time.)

Note: a 'boat slip' in these documents referrs to an 8x25' rectangle.

Note2: if removing/replacing something, make clear what is going away.


It worked out well, and I learned quite a bit.

Best wishes for your project. Make the call to Concord.

-pb
pontoonbarge is offline   Reply With Quote
The Following 2 Users Say Thank You to pontoonbarge For This Useful Post:
boccebay (04-16-2015), Rattlesnake Gal (05-01-2015)
Old 04-16-2015, 06:28 AM   #9
smith point boater
Senior Member
 
Join Date: Apr 2004
Location: West Alton,NH
Posts: 197
Thanks: 328
Thanked 92 Times in 51 Posts
Default Dock

I would suggest you call Watermark (or one of the local dock companies). They know the shoreline regulations VERY well and should be able to advise on what you can and cannot do. We have used Watermark for a few dock projects over the years and they have handled the whole thing start to finish
smith point boater is offline   Reply With Quote
The Following User Says Thank You to smith point boater For This Useful Post:
boccebay (04-16-2015)
Old 04-16-2015, 07:04 AM   #10
sluggo
Senior Member
 
Join Date: Nov 2010
Posts: 168
Thanks: 13
Thanked 70 Times in 43 Posts
Default

Give Center Harbor Dock & Pier a call, Don can answer any questions you have relating to your dock and permitting.... 253-4000
sluggo is offline   Reply With Quote
The Following User Says Thank You to sluggo For This Useful Post:
boccebay (04-16-2015)
Old 04-16-2015, 08:04 AM   #11
Safe Harbor
Junior Member
 
Join Date: Oct 2014
Posts: 3
Thanks: 4
Thanked 2 Times in 2 Posts
Default Get The Right Facts

Agree with calling the dock companies. I changed a small single dock on my Winnipesaukee property (with 150 ft of frontage) to a U shaped dock last fall. You absolutely have to get permits if you are changing the dock structure and the dock companies are best suited to draw them up and file them. Your property lines with adjacent neighbors can play a factor with positioning of a wider dock as there are set back rules. It is time consuming and exacting process but having a properly permitted legal structure is important. Good luck!
Safe Harbor is offline   Reply With Quote
The Following User Says Thank You to Safe Harbor For This Useful Post:
boccebay (04-16-2015)
Old 04-16-2015, 10:39 AM   #12
boccebay
Junior Member
 
Join Date: Apr 2015
Posts: 3
Thanks: 5
Thanked 0 Times in 0 Posts
Default

Thank you for all of these suggestions. This information is encouraging especially because I would not consider my current L configuration acceptable for two boats which seems to be the minimum. By my estimate, the pier juts out about 12-15 feet and then takes a right and runs parallel to the shore. I can fit one boat on the outside and a jetski or whaler on the inside but certainly not anything of decent size. My hope is that i could fit two boats on the outside with a T configuration where the top of the T runs parallel to the shore.

I plan on calling Concord as well as a dock company for some advice. Since the project is not imminent, I have been hesitant to engage a dock company. The Center Harbor Dock and Pier Co. is very close to me. Have people enjoyed working with them and do you believe they would look at a project like this that is likely a year or more off from becoming a reality?
boccebay is offline   Reply With Quote
Old 04-16-2015, 11:07 AM   #13
pontoonbarge
Member
 
pontoonbarge's Avatar
 
Join Date: Jan 2008
Location: Windham, NH
Posts: 42
Thanks: 86
Thanked 18 Times in 9 Posts
Default docks

Since you have some time, it makes it easier. I did all my drawings, and had the dock (aluminum winch-out ) done by Winnipesaukee Island Services. Very happy with them, and love the new dock.

My advice on talking to Concord from the get-go was because that would have saved me some time..

The dredge/fill permits get submitted (5 copies) to town halls, which is really useful info that I didn't have...

Meeting face to face with DES and the Conservation commission was helpful.
pontoonbarge is offline   Reply With Quote
Old 04-30-2015, 08:11 PM   #14
tummyman
Senior Member
 
Join Date: Aug 2009
Location: Moultonborough
Posts: 780
Thanks: 233
Thanked 631 Times in 228 Posts
Default

See my prior post on this thread at 4/15/2015//3:04PM

Just received my approved permit from DES for a "U" shaped dock. Interestingly, the permit is good for only 5 years and has a specific expiration. I was not expecting any expiration. I have no idea what the process will be when it expires in 2020 as there is nothing I can find other than making another full re-submittal.
tummyman is offline   Reply With Quote
Old 04-30-2015, 08:23 PM   #15
ishoot308
Senior Member
 
Join Date: Feb 2008
Location: Gilford, NH / Welch Island
Posts: 5,928
Thanks: 2,285
Thanked 4,939 Times in 1,915 Posts
Default

Quote:
Originally Posted by tummyman View Post
See my prior post on this thread at 4/15/2015//3:04PM

Just received my approved permit from DES for a "U" shaped dock. Interestingly, the permit is good for only 5 years and has a specific expiration. I was not expecting any expiration. I have no idea what the process will be when it expires in 2020 as there is nothing I can find other than making another full re-submittal.
I believe that means you have 5 years to get the work done, not 5 years for the dock....

Dan
__________________
It's Always Sunny On Welch Island!!
ishoot308 is offline   Reply With Quote
Old 04-30-2015, 08:30 PM   #16
SAB1
Senior Member
 
Join Date: Feb 2012
Location: Tuftonboro
Posts: 1,165
Thanks: 182
Thanked 297 Times in 220 Posts
Default

Ishoot is correct and if during that 5 year period you need additional work done you don't need to pay fee again.
SAB1 is offline   Reply With Quote
Old 05-01-2015, 06:16 AM   #17
tummyman
Senior Member
 
Join Date: Aug 2009
Location: Moultonborough
Posts: 780
Thanks: 233
Thanked 631 Times in 228 Posts
Default

OK...if that is the case, I'm good to go !!! Thanks for the clarification. The data from DES wasn't that clear at all.
tummyman is offline   Reply With Quote
Old 05-01-2015, 08:36 AM   #18
Onshore
Senior Member
 
Join Date: Apr 2004
Posts: 500
Thanks: 12
Thanked 400 Times in 143 Posts
Default

ishoot308 is correct.
Onshore is offline   Reply With Quote
Old 05-01-2015, 10:08 AM   #19
TheProfessor
Senior Member
 
Join Date: Nov 2010
Posts: 1,062
Thanks: 17
Thanked 326 Times in 198 Posts
Default

Quote:
Originally Posted by boccebay View Post
I bought a home on the lake about 1.5 years ago but have been coming up my whole life. The home has 150' of waterfront with a L shaped dock in a smaller cove. The dock may have a few years left in it but is at the end of its life cycle.

What are my options to replace it? !

Hire an independent waterfront/lake home/ dock specialist.

My neighbor purchased a home on the lake. Redesigned the whole waterfront including adding horseshoe permanent dock.
The guy he hired did everything. All permits.
The guy knows everything to do with docks. Knows all in Concord.

Well worth the money spent.

Yes, of course, you can do all yourself.
TheProfessor is offline   Reply With Quote
Old 05-02-2015, 07:27 AM   #20
sluggo
Senior Member
 
Join Date: Nov 2010
Posts: 168
Thanks: 13
Thanked 70 Times in 43 Posts
Default

Tummyman ... Your permit is good for five years from the dated acceptance of the application. If for any reason you do not complete the work in that time frame you can apply for a five year extension. You have to wait until you have thirty days left on the permit and there is a form on the D.E.S web site you can down load and fill out for that extended time frame. Complete the form and mail it in.... There are no costs or fees to the state involving that process.
sluggo is offline   Reply With Quote
The Following User Says Thank You to sluggo For This Useful Post:
tummyman (05-02-2015)
Reply

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -5. The time now is 11:14 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.

This page was generated in 0.24641 seconds