Does anyone have any idea what is going on with it?
I had not seen a single train run this season so far. I did see a maintenance pickup running the tracks last weekend. Looking at their website I see "Schedule is TBD" and there are NO online or phone-in tickets available for Weirs or Merideth. Odd... |
06-01-2023, 06:34 PM | #2 |
Senior Member
Join Date: Jul 2009
Location: San Francisco/Meredith
Posts: 1,525
Thanks: 630
Thanked 653 Times in 332 Posts
|
It's a fun ride.
__________________
Gary ~~~~_/) ~~~ ~~~~~~~~ |
06-07-2023, 01:30 PM | #3 |
Senior Member
Join Date: Aug 2018
Location: New Durham
Posts: 169
Thanks: 122
Thanked 96 Times in 57 Posts
|
I don't think they have enough help; the Hobo trains are running a very limited schedule too, they only have the schedule up for the next two weekends, nothing beyond that.
|
The Following User Says Thank You to Trail Goer For This Useful Post: | ||
AltonCAM (06-09-2023) |
06-07-2023, 02:19 PM | #4 |
Senior Member
Join Date: Apr 2004
Location: North Reading, MA and South Down Shores
Posts: 850
Thanks: 57
Thanked 183 Times in 114 Posts
|
Staffing Issues
I heard that they are having issues with staffing and they will be starting regular service sometime in July.
Jetskier |
06-08-2023, 02:34 AM | #5 |
Senior Member
|
...... Railroad private property, no trespassing!
I have heard from someone who lives next to this single railroad track that it is owned by the State of New Hampshire and this Hobo R.R.summer tourist train, single track was also the former NH train route between Boston and Montreal, Quebec via New Hampshire. There are NO trains using the track for a number of years now except for the summer Hobo Railroad because the New England transportation road system has totally moved from trains on railroad tracks to big trucks with rubber tires that transport freight directly to their final destination. Something that trains do not do.
There is a contention over what's the best use for this track. Some want it recreated into a Lake Winnipesaukee waterfront rail trail, a 12' wide smooth gray gravel roadway with two-way traffic used by pedestrians, bicyclers, and cross country skiers. For most every day of the year it is a totally unused single railroad track positioned directly close to the shoreline on Lake Winnipesaukee and the single home property abutters very much are happy with this situation, and want it to stay this way as opposed to a public use, rail trail for pedestrians, bicyclers, and cross country skiers. The State of New Hampshire came to own this single track when it was abandoned by the Boston and Montreal Railroad. From about 1880 to 1970 it was a very busy train track but trains have become replaced by big trucks with tires here in New England. Here's a rail trail website ...... the Concord- Lake Sunapee Rail Trail ..... www.clsrt.org .... from the Concord NH area that shows a fantastic improvement remade from an abandoned railroad track, And, a rail trail in the Wolfeboro NH area .....the Cotton Valley Rail Trail ..... www.cottonvalleyrailtrail.org Laconia NH has the Wow Trail .... www.wowtrail.org .... which some day MIGHT get extended onto the railroad right-of-way and single track that is currently the home of the Hobo Railroad ..... www.hoborr.com ..... a local summer tourist train along the beautiful shoreline on Lake Winnipesaukee.
__________________
... down and out, liv'n that Walmart side of the lake! |
Sponsored Links |
|
06-08-2023, 09:21 AM | #6 |
Senior Member
Join Date: Jun 2021
Posts: 3,188
Thanks: 2
Thanked 565 Times in 463 Posts
|
I believe the track was purchased with federal funds.
And it isn't the Boston-Montreal... that would have been what we now call the Northern Line. This track is the Concord-Lincoln. The WOW was in the LDS, as they wish to redirect up Elm and attach to trails on that side. |
06-14-2023, 01:47 PM | #7 |
Senior Member
Join Date: Aug 2018
Location: New Durham
Posts: 169
Thanks: 122
Thanked 96 Times in 57 Posts
|
John, the tracks along Lake Winnipesaukee use to go to Woodsville, NH via Plymouth, but north of Plymouth was abandoned sometime in the 1950's. So it is true, there use to be a lot of trains running between Boston and Montreal. The rail line going up to Lincoln was technically a branch that started in Plymouth, with the mainline continuing up the valley to Rumney, Wentworth, Warren, Glencliff, Haverhill and so on.
fatlazyless, railroads are good for moving bulk commodities, they are cheaper and far more efficient at it than trucks will ever be. They still deal a lot with final destination commodities. If it's not direct rail service, needs can still be met through container freight and transload terminals. The state did not purchase an abandoned railroad, they purchased an active one, in fact they purchased it to protect it from being abandoned and torn up. The city of Laconia and WOW Trails decade long battle to try and oust the railroad and force the state to tear up the tracks, ended back in 2019 when Laconia city council finally conceded. |
06-14-2023, 02:39 PM | #8 |
Senior Member
Join Date: Mar 2006
Location: Merrimack and Welch Island
Posts: 4,197
Thanks: 1,276
Thanked 1,570 Times in 1,019 Posts
|
Heritage
Thanks, Trailgoer. Good info. Trains were a part of my growing up. No Interstates then and lots of folks didn't have cars. Growth was around the RR depots as it had been around the rivers 100+ years earlier. I think or the RR's as part of our local heritage and, while I appreciate those who want hiking/bike trails, I think we should have due respect for history. Rails to Trails at least preserves the routes.
|
06-14-2023, 03:13 PM | #9 |
Senior Member
Join Date: Jan 2006
Posts: 6,573
Thanks: 742
Thanked 1,428 Times in 990 Posts
|
This is a little bit off topic but it's about the railroad so hope it's ok. All these posts made me wonder what is happening in Alton Bay where the railroad right of way was. There was a dispute as to whether the railroad has a right to take the land back. Anybody heard any more? Is it waiting on legal?
|
06-14-2023, 04:51 PM | #10 | |
Senior Member
Join Date: May 2004
Location: Weirs Beach
Posts: 1,959
Thanks: 80
Thanked 975 Times in 436 Posts
|
Quote:
Woodsy
__________________
The only way to eliminate ignorant behavior is through education. You can't fix stupid. |
|
06-14-2023, 05:56 PM | #11 | ||
Senior Member
Join Date: Feb 2015
Posts: 825
Thanks: 113
Thanked 207 Times in 130 Posts
|
Quote:
Quote:
ROW should revert back to the (former or) current land owner rather than being a keepsake for the State. After-all, it was taken for a specific purpose. |
||
06-14-2023, 05:58 PM | #12 | |
Senior Member
Join Date: Jan 2006
Posts: 6,573
Thanks: 742
Thanked 1,428 Times in 990 Posts
|
Quote:
|
|
06-14-2023, 08:37 PM | #13 | |
Senior Member
Join Date: Jun 2021
Posts: 3,188
Thanks: 2
Thanked 565 Times in 463 Posts
|
Quote:
The purpose to keep the corridor open for future transportation options. |
|
06-14-2023, 09:08 PM | #14 |
Senior Member
Join Date: May 2004
Location: Weirs Beach
Posts: 1,959
Thanks: 80
Thanked 975 Times in 436 Posts
|
Tis...
I do not know the status. However, I do not think you can sue the State for Adverse Possession. So, if people encroached on the State RR ROW, they are probably out of luck. Outdoorsman, The State purchased the rail lines when the (then) current owner filed for abandonment. Then leased most of them out. If there was any "Eminent Domain" it happened back in the 1800's when the railroads were originally built. The property owners would have been duly compensated. https://www.nh.gov/dot/org/aerorailt...ansit/rail.htm Woodsy
__________________
The only way to eliminate ignorant behavior is through education. You can't fix stupid. |
06-15-2023, 04:22 AM | #15 |
Senior Member
Join Date: Jan 2006
Posts: 6,573
Thanks: 742
Thanked 1,428 Times in 990 Posts
|
I wonder if there are any statistics on if a truly fair price is paid in an eminent domain situation. Or do people have to give their land up for a pittance?
I know there were a couple of people in this group who were in involved. I hope they update us. |
06-15-2023, 08:54 AM | #16 |
Senior Member
Join Date: Jun 2021
Posts: 3,188
Thanks: 2
Thanked 565 Times in 463 Posts
|
It is by market rate.
|
06-15-2023, 09:32 AM | #17 | |
Senior Member
Join Date: Aug 2018
Location: New Durham
Posts: 169
Thanks: 122
Thanked 96 Times in 57 Posts
|
Quote:
|
|
06-15-2023, 02:18 PM | #18 |
Senior Member
Join Date: Jan 2006
Posts: 6,573
Thanks: 742
Thanked 1,428 Times in 990 Posts
|
|
06-15-2023, 04:16 PM | #19 |
Senior Member
|
..... a NH rail trail near you?
Here's something that may be of interest ....... go to www.railstotrails.org ..... 2/3-way down the page, enter your zip code at "Find Your Trail Experience" to see the three rail trails closest to you. You could be surprised to find a rail trail, right here, in New Hampshire that you were unaware.
__________________
... down and out, liv'n that Walmart side of the lake! |
06-15-2023, 08:45 PM | #20 |
Senior Member
Join Date: Jun 2021
Posts: 3,188
Thanks: 2
Thanked 565 Times in 463 Posts
|
It is done by appraisal much the same as getting a bank appraisal... or if up-to-date even a property tax appraisal.
|
08-01-2023, 08:02 AM | #21 |
Senior Member
Join Date: Aug 2018
Location: New Durham
Posts: 169
Thanks: 122
Thanked 96 Times in 57 Posts
|
Rumor mill - I guess the Hobo & Winnipesaukee Scenic railroads are for sale, and it explains some of the reasons for this year's odd ball scheduling for both railroads. It appears a buyer is already under agreement for both and currently going through the approval process.
|
08-01-2023, 10:02 AM | #22 |
Senior Member
Join Date: Feb 2015
Location: Tilton/Paugus Bay
Posts: 235
Thanks: 13
Thanked 61 Times in 43 Posts
|
Thanks TG, good to know.
I know that the rails are still maintained from Lakeport up to Plymouth as the Hobo RR does run up to Common Man during the fall. I see the yellow rail maintenance pickup about once a week pass by. |
08-04-2023, 08:44 AM | #23 |
Senior Member
Join Date: Aug 2018
Location: New Durham
Posts: 169
Thanks: 122
Thanked 96 Times in 57 Posts
|
They actually lease and maintain the line down to Lochmere (Silver Lake Rd). South of that, and down into Concord, is leased to the New England Southern Railroad.
|
08-04-2023, 10:54 AM | #24 |
Senior Member
Join Date: Jun 2021
Posts: 3,188
Thanks: 2
Thanked 565 Times in 463 Posts
|
Is that for the rail bikes?
I don't think the train itself has travelled any further than Lakeport for awhile now. |
08-04-2023, 09:07 PM | #25 |
Senior Member
Join Date: Aug 2018
Location: New Durham
Posts: 169
Thanks: 122
Thanked 96 Times in 57 Posts
|
The railbikes are part of the services offered by the railroad but trains still operate between Lochmere and Lakeport and just this week they sent three privately owned passenger cars down that had been stored up in Lincoln, NH for the past 20+ years. I saw them heading down towards Manchester and we're on the end of a long freight train.
|
08-05-2023, 07:28 AM | #26 |
Senior Member
Join Date: Oct 2004
Location: Laconia NH
Posts: 5,550
Thanks: 3,163
Thanked 1,094 Times in 788 Posts
|
Winnipesakee Watershed Project.
Back in the 80s, a big push was to extend the sewer lines to Alton to preserve the lake's cleanliness. The project ran out of money and ended up near Dinsmoor Point Road in Gilford. It is not over. It is still open and will continue to Alton in the future.
The project uses the old Lake Shore Railroad bed. Some folks had to move existing structures off the old bed. There weren't many as Gilford knows the state still has a right of way and prevents owners from building on it. Gilford still continues to prevent permanent structures on the right of way. As for Alton, well I guess, that will be a fine mess along Rte. 11. There are talks of using Biden's infrastructure bill to finish the project.
__________________
Someday may never be an actual day. |
08-05-2023, 02:22 PM | #27 |
Senior Member
Join Date: Apr 2004
Location: Moultonboro, NH
Posts: 2,897
Thanks: 469
Thanked 682 Times in 380 Posts
|
The railroad looked like it was running today.
|
08-13-2023, 10:45 PM | #28 |
Senior Member
Join Date: Aug 2018
Location: New Durham
Posts: 169
Thanks: 122
Thanked 96 Times in 57 Posts
|
Last I looked they are operating 4 days a week (Thursday - Sunday) with very limited departures on those days.
I'm sure next year will be either back to normal or drastically different with the new owner. |
08-14-2023, 06:02 AM | #29 |
Senior Member
|
... new Unobtainium Express
Clark's Bears done hit a new Unobtainium mine deep in them their woods along the Pemi River, and will be choo-chooing hopper freight cars loaded with Unobtainium down to that Portsmouth sea port.
With the Wolfman driving the steam locomotive, and the black bears riding shotgun Unobtanium security, it will be a very busy freight train ....... choo-choo-choo ..... the Unobtainium Express ...... here it come!
__________________
... down and out, liv'n that Walmart side of the lake! |
08-22-2023, 02:10 PM | #30 |
Senior Member
Join Date: Apr 2004
Location: North Reading, MA and South Down Shores
Posts: 850
Thanks: 57
Thanked 183 Times in 114 Posts
|
Hobo railroad and Winnipesakee Scenic Railroad sold
|
Bookmarks |
Thread Tools | |
Display Modes | |
|
|