Just a word of warning for those of you that use I-93 North to get to the lake. There is new bridge work being done on 3-4 bridges just before exit 20. They have cut it down to one-lane for a couple of miles. It is bound to cause some major backups on Fridays. Don't know how long they will be there but it looks like it will be awhile since they repainted the traffic lines. Good news is that this good weather must have given them a chance to start a little early.

Best of luck
Steveo is offline   Reply With Quote
Old 03-26-2012, 12:48 PM   #2
SIKSUKR
Senior Member
 
SIKSUKR's Avatar
 
Join Date: Apr 2004
Posts: 5,075
Thanks: 215
Thanked 903 Times in 509 Posts
Default

Went through yesterday. Don't understand why cars are driving only 30 mph in a 55.
__________________
SIKSUKR
SIKSUKR is offline   Reply With Quote
Old 03-26-2012, 04:37 PM   #3
Belmont Resident
Senior Member
 
Belmont Resident's Avatar
 
Join Date: Apr 2004
Location: Belmont NH but prefer Jackman Maine
Posts: 1,857
Thanks: 491
Thanked 409 Times in 251 Posts
Default Same reason

Quote:
Originally Posted by SIKSUKR View Post
Went through yesterday. Don't understand why cars are driving only 30 mph in a 55.
They slow down to 55 in a 65 when they see a cop.
Same reason they slow down to gawk at an accident scene.
When you figure out why let the rest of us know
__________________
"better to have a short life that is full of what you like doing, then a long life spent in a miserable way.."
Belmont Resident is offline   Reply With Quote
Old 03-26-2012, 07:44 PM   #4
no-engine
Senior Member
 
Join Date: Jul 2008
Location: West side Winnipesaukee, Lakes Region
Posts: 516
Thanks: 20
Thanked 52 Times in 40 Posts
Default

Not a big deal today....... Just keep going.
no-engine is offline   Reply With Quote
Old 03-26-2012, 09:18 PM   #5
tummyman
Senior Member
 
Join Date: Aug 2009
Location: Moultonborough
Posts: 774
Thanks: 231
Thanked 628 Times in 226 Posts
Default It is Northbound as well as Southbound !!!!

Not only is the construction in the northbound lanes, but it is also on the southbound side in the same general area. We got stuck for almost a half hour on Friday night northbound. There was little evidence of any excavation going on...maybe three wheel barrows of material in a pile. On the southbound side, there was nothing going on through Saturday night except a mile or so of barrels blocking one lane and a short stretch of Jersey barriers. This is going to be a real headache in both directions until it gets completed and there isn't a real good alternative. Any idea how long this is going to be under construction.
tummyman is offline   Reply With Quote
Sponsored Links
Old 03-27-2012, 05:51 AM   #6
Winnisquamguy
Senior Member
 
Winnisquamguy's Avatar
 
Join Date: Dec 2010
Location: Winnisquam, NH
Posts: 613
Thanks: 419
Thanked 163 Times in 115 Posts
Default

Quote:
Originally Posted by tummyman View Post
Not only is the construction in the northbound lanes, but it is also on the southbound side in the same general area. We got stuck for almost a half hour on Friday night northbound. There was little evidence of any excavation going on...maybe three wheel barrows of material in a pile. On the southbound side, there was nothing going on through Saturday night except a mile or so of barrels blocking one lane and a short stretch of Jersey barriers. This is going to be a real headache in both directions until it gets completed and there isn't a real good alternative. Any idea how long this is going to be under construction.
I found this on NH DOT website, hope it helps.

Interstate 93 in both directions: from after NH 132 to before Exit 20: US 3
construction work, roadway reduced to one lane — until July 26, 2013
Comment: Bureau of Construction project. This project consists of 2.5 miles of pavement rehabilitation and bridge rehabilitation work on 6 bridges in the Town of Northfield. The work begins at mile marker 53.0 and ends at mile marker 56.0. The roadway is reduced to one lane until May 18, 2012, when it will be opened up to the normal two lanes.
__________________
"I'd rather be ridin than rolling"
Winnisquamguy is offline   Reply With Quote
The Following 2 Users Say Thank You to Winnisquamguy For This Useful Post:
Bear247 (03-27-2012), diz (03-27-2012)
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -5. The time now is 03:06 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.

This page was generated in 0.18894 seconds