Go Back   Winnipesaukee Forum > Lake Issues > General Issues
Home Forums Gallery Webcams Blogs YouTube Channel Classifieds Calendar Register FAQDonate Members List Search Today's Posts Mark Forums Read

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 10-20-2012, 12:41 PM   #9
NoBozo
Senior Member
 
Join Date: Jun 2008
Location: Portsmouth. RI
Posts: 2,231
Thanks: 400
Thanked 460 Times in 308 Posts
Default The Engineers Report

Our Town Owned 1.5 MW Turbine has been inactive since June 16 with a broken gearbox. The engineers report just came back yesterday. Lots of metal shavings in the oil. Gears and bearings chewed up.

The engineers are calling our turbine an orphan. It seems 3 out of the 5 of this turbine (AAER Canada..now defunct) installed in the U.S. has failed the gearbox at around 3 years. Ours is just over that. The warranty was for two years.

SO: AFTER we spend $800K to fix it, the report says.. AND... IF the new gearbox...same model as the last, lasts 10 years, with all routine expences and income considered....the turbine will run a deficit of ($400K) per year. We still owe $2.4M on the current loan.

I used to like this machine. Let the buyer beware. NB
NoBozo is offline  
 

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -5. The time now is 08:43 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.

This page was generated in 0.40656 seconds