Default 19 mile bay work

Anyone know what they are doing over by the beach where all the ice fisherman access the the lake with their Bob houses? South side of the pavilion. They seem to installing pavers from the parking area to waters edge.
SAB1 is offline   Reply With Quote
Old 01-12-2020, 05:37 AM   #2
tis
Senior Member
 
tis's Avatar
 
Join Date: Jan 2006
Posts: 6,370
Thanks: 711
Thanked 1,371 Times in 947 Posts
Default

Are they? If I had to guess i would say they are making an access to the lake. People were complaining because when they built the new perched beach there was no access to the lake in the winter.
tis is online now   Reply With Quote
Old 01-12-2020, 06:29 AM   #3
SAB1
Senior Member
 
Join Date: Feb 2012
Location: Tuftonboro
Posts: 1,162
Thanks: 182
Thanked 297 Times in 220 Posts
Default

possibly but Hard to believe it would hold up. The trucks and atv:s that go thru there in the winter to access the ice will destroy those pavers when it softens up. Hopefully they are not going close it off-
SAB1 is offline   Reply With Quote
Old 01-12-2020, 07:38 AM   #4
tis
Senior Member
 
tis's Avatar
 
Join Date: Jan 2006
Posts: 6,370
Thanks: 711
Thanked 1,371 Times in 947 Posts
Default

Quote:
Originally Posted by SAB1 View Post
possibly but Hard to believe it would hold up. The trucks and atv:s that go thru there in the winter to access the ice will destroy those pavers when it softens up. Hopefully they are not going close it off-
I agree, it doesn't seem pavers would stand up, but I do know people felt it was closed off already and that is what they were complaining about.
tis is online now   Reply With Quote
Old 01-12-2020, 07:42 AM   #5
tis
Senior Member
 
tis's Avatar
 
Join Date: Jan 2006
Posts: 6,370
Thanks: 711
Thanked 1,371 Times in 947 Posts
Default

I just read this, Sab:

" They are making it so we can drive onto the ice. The building inspector didn't like what they did after they finished the new wall so he was making them change what they put down because he thought it would get ripped up when guys started plowing the ramp to the ice. Was supposed to be done by this past week but it isn't yet."
tis is online now   Reply With Quote
The Following User Says Thank You to tis For This Useful Post:
SAB1 (01-12-2020)
Sponsored Links
Old 01-14-2020, 11:25 AM   #6
Onshore
Senior Member
 
Join Date: Apr 2004
Posts: 500
Thanks: 12
Thanked 400 Times in 143 Posts
Default

Quote:
Originally Posted by tis View Post
Are they? If I had to guess i would say they are making an access to the lake. People were complaining because when they built the new perched beach there was no access to the lake in the winter.
Actually NHDES approved a slope beach at this site. There was considerable disagreement on the natural sediment movement in the area with many in the community insisting that the area accumulated sand and the NHDES maintaining that the area had a history of shoreline erosion that would make a sloped beach on the site unsustainable. The NHDES agreed to "let nature decide" and issued a conditional one-time approval. The description on the permit issued in 2001 read:

"Remove 11,256 sq ft of fill and place sand along 200 linear feet of shoreline to restore a 200 ft x 14.5 ft sloped beach area lakeward of a 217 ft x 21.5 ft perched beach with a 12 ft wide winter access ramp along the southern edge on 616 ft of frontage, in Nineteen Mile Bay, on Lake Winnipesaukee."

It contained a specific condition that specified that there was no long term guarantee of the maintenance of a sloped beach if natural processes removed it. The findings explaining the basis for the conditional approval read as follows:

"1. This project is classified as a major project per Rule Wt 303.02(o), construction of a public beach.
2. This project does not require Governor and Council approval since no portion of the project will be located within the public submerged lands.
3. The 200 ft x 14.5 ft sloped beach area was filled to construct Rte 109 with additional material added by the Town in 1996 to correct erosion problems along the shoreline.
4. Future replenishment of the sloped beach area will not be necessary provided Nineteen Mile Bay is a sand accumulation site as alleged by the town.
5. If, as alleged by the Wetlands Bureau, this site experiences sand erosion future sand replenishment would be environmentally damaging. Therefore future replenishment will not be permitted."

The slope beach was constructed lakeward of the current shoreline according to plan. Within a few years it was all gone.
Onshore is offline   Reply With Quote
The Following 4 Users Say Thank You to Onshore For This Useful Post:
Descant (01-14-2020), FlyingScot (01-14-2020), steve c (01-16-2020), Susie Cougar (01-14-2020)
Old 01-14-2020, 11:47 AM   #7
tis
Senior Member
 
tis's Avatar
 
Join Date: Jan 2006
Posts: 6,370
Thanks: 711
Thanked 1,371 Times in 947 Posts
Default

Very interesting. So in 2001 DES approved a sloped beach saying that it probably wouldn’t last and if it didn’t DES wouldn’t approve it again, is that right ? So most recently the permit approved was for a perched beach since, as expected,
the sloped beach washed away. Do I have that right??
tis is online now   Reply With Quote
Old 01-14-2020, 12:18 PM   #8
Onshore
Senior Member
 
Join Date: Apr 2004
Posts: 500
Thanks: 12
Thanked 400 Times in 143 Posts
Default

It was agreed that a wall would be constructed halfway up the originally proposed beach such that if the sloped beached did not erode the wall would not be obtrusive but if the sand did erode it would provide a hard stop and allow the sand area above it to be maintained as a perched beach. The bisecting wall is what you see at the shoreline today. That 2001 permit was the only construction permit issued. The rest has been repairs. There has been no other permit for new perched beach construction on the site.
Onshore is offline   Reply With Quote
The Following User Says Thank You to Onshore For This Useful Post:
steve c (01-16-2020)
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -5. The time now is 04:50 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.

This page was generated in 0.54263 seconds