Go Back   Winnipesaukee Forum > Winnipesaukee Forums > General Discussion
Home Forums Gallery Webcams Blogs YouTube Channel Classifieds Register FAQDonate Members List Search Today's Posts Mark Forums Read

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 03-31-2019, 09:08 AM   #10
Lakegeezer
Senior Member
 
Join Date: Feb 2003
Location: Moultonboro, NH
Posts: 1,678
Blog Entries: 1
Thanks: 354
Thanked 639 Times in 290 Posts
Default More to the story

For those interested in more history of this situation, look at the Moultonboro's GIS system at https://www.axisgis.com/moultonboroughNH/ - Search for Corr, select the property, then click on documents and links. There are building permits, zoning board decisions, variance applications and DES correspondence.

While the location change is well documented and ZB approved, I'm left wondering where the "changes in configuration, construction type or dimensions in accordance with plans dated 11/2/15" were approved. The variance application and new building permit, dated 5/25/16 references the original building permit and raises the estimated cost but has no hint of a multi-level structure.

Unless the building is longer, which the pictures imply it may be, there shouldn't be greater impact to water quality from roof runoff. Hopefully the supreme court will focus on confirming the building was built as approved.
__________________
-lg
Lakegeezer is offline   Reply With Quote
The Following User Says Thank You to Lakegeezer For This Useful Post:
Rusty (03-31-2019)
 

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -5. The time now is 07:24 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

This page was generated in 0.86034 seconds