Go Back   Winnipesaukee Forum > Winnipesaukee Forums > General Discussion
Home Forums Gallery Webcams Blogs YouTube Channel Classifieds Register FAQ Members List Donate Today's Posts

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 07-21-2007, 09:29 AM   #1
DREAMS
Senior Member
 
Join Date: Sep 2004
Posts: 51
Thanks: 0
Thanked 0 Times in 0 Posts
Smile Moultonboro Neck Bike/Walking Path

I would like to contact the appropriate members responsible for engineering this recent phase completed. Of course, the contractor should be ashamed for the excessive hours spent in completing the project and the poor results based on the combination of installation/engineering? The sidewalk will always be unsafe for biking due to the constant washing of gravel and sand on the surface with rain storms. I don't understand why they didn't design the sidewalk to be elevated higher than the road if they didn't want to pave the entire surface and eliminate the gravel space. After how many hundreds of thousands of dollars paid by hard work and fundraising for phase 2, what will the third phase look like which is the most elevated section of the entire road? The first phase was done in good taste and has proved to sustain the weather conditions. Why change the plan?
DREAMS is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -4. The time now is 11:06 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.

This page was generated in 0.22495 seconds