Go Back   Winnipesaukee Forum > Lake Issues > General Issues
Home Forums Gallery Webcams Blogs YouTube Channel Classifieds Register FAQ Members List Donate Today's Posts

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 03-09-2015, 10:19 PM   #11
Wreckn1
Junior Member
 
Join Date: Jul 2008
Posts: 17
Thanks: 0
Thanked 8 Times in 4 Posts
Default

Quote:
Originally Posted by CAVU View Post
Its probably too late but, any idea who to contact about bidding for the site work, shoring, concrete side of things. I know the GC's bid in the fall, I never had anything come across the usual job lead sites.
Yes it is too late. All GCs contacted their "subs of choice" for pricing to determine a price. The reason you did not see it on the usual job lead sites is because they did not want every sub in mass, nh and beyond contacting them when they didn't even have a full set of drawings. The GC has been selected to build it and they have their subs already lined up.
Wreckn1 is offline  
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -4. The time now is 08:29 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.

This page was generated in 0.17432 seconds