Meredith Neck Rd is a non-numbered state road, not a town road, and the bridge will be reconstructed by the N.H. Dept of Transportation and the H.E. Sargent Corp from Orono, Maine. It is a $732.430 project.

H.E. Sargent Corp ......www.sargent.us/who-we-are/

So, why is Meredith Neck Rd a non-numbered state road and not a town road?

The answer goes back to the 1880's when New Hampshire politicians in Concord were look'n for a faster, easier route to get out to Bear Island Hotel. There's a good sized old stone bridge that crosses a brook between the Lower Meadow and Upper Meadow Farms, still in use, at the start of the Meredith Neck Rd, plus some big hills, and low, wet swamp land and it was the State of NH motivated by the Bear Island Hotel-NH politicians that got it built. What really mattered was having a good time and the Bear Island Hotel was a happening place and the Concord pols needed a better, faster way to get out there. They would take the train from Concord on Friday afternoon to Meredith and then traveled by horse and buggy down the Meredith Neck Rd and they crossed this bridge when they got there.

Unfortunately, the Bear Island Hotel, a 40-room structure burned down on Thursday, November 8, 1934, 90 years ago and was never replaced.
__________________
... down and out, liv'n that Walmart side of the lake!
fatlazyless is offline   Reply With Quote
The Following 2 Users Say Thank You to fatlazyless For This Useful Post:
Hoboken (09-04-2024), Marauder (09-17-2024)
Old 09-14-2024, 07:29 AM   #2
MeredithMan
Senior Member
 
MeredithMan's Avatar
 
Join Date: Aug 2013
Location: Bedford, NH; Meredith, NH
Posts: 901
Thanks: 245
Thanked 784 Times in 313 Posts
Default Hopefully just one more week...

...the repair will allegedly be done at the end of next week. Wagon Wheel, which normally is a nice quiet road to walk on, is now a dirt racetrack as a result of the detour. The vegetation/brush on the sides of the road is now totally brown from the dirt/dust. Hopefully we get some rain soon to wash it away so everything doesn't die off.
MeredithMan is offline   Reply With Quote
Reply

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -5. The time now is 05:27 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.

This page was generated in 0.25881 seconds