It was always planned to use two cranes to put it in but on Friday the scheduled crane company backed out. A last minute replacement for the Monday lift was located and he was able to do it with one 100 ton crane.
The travel lift at Silver Sands may have the weight capacity but the length of the boat and the 16 foot beam made it impossible to do it that way.
|