Correct, it is NOT the channel bridge closing, it is the rail bridge.

Emergency vehicles have the entire channel bridge to themselves and then divert through a super-secret passage to the other side of the rail bridge.

As stated in the original thread, leaving 1 lane open on the rail bridge would triple the time to complete.