Took me a while to find it and correct me if I'm wrong but this is the proposed change they are embarking to study the impacts of (as written)
• Private Docking Structures; Commercial Docking Structures, Public Docking Structures, Docking Structures At Marinas -
Establish standard of 100 SF of dock per 25 LF of frontage with 900 SF maximum and 200 SF minimum
The entirety of proposed changes can be found here:
https://www.des.nh.gov/organization/...es-summary.pdf