Quote:
Originally Posted by burgerunh
Excavating a deeper channel is not going to change the static level of the water in the lake or the clearance under the bridge. It will just make a deeper channel.
|
Wolfeboro's Back Bay is part of a river.
Excavating (dredging) a deeper channel would speed up the flow, thereby lowering the river; however, this lowering wouldn't be sufficient to solve the clearance issue being discussed. IMHO.