Default excavation project.

To go along with the excavation part. Was looking at lifting the camp to put a foundation(crawl space bottom, full basement on back side). Camp is built on side of a hill. If look at it from the side its an inverted "L", single floor on high side of hill. Does it require separate jobs, lift, excavate, foundation, placement. Is there anybody that does all of this that would avoid all the scheduling.