Quote:
Originally Posted by joey2665
Not a very detailed article. When in 2020 will it be shut down, what is the estimated closure period and why is the detour 18 miles. Especially when there are several routes to either get to Laconia Road or to 11a towards Gilford that are much less than 18 miles.
Sent from my iPhone using Winnipesaukee Forum mobile app
|
The article says the work is scheduled to take place in 2020, work starting in May or April, depending on closing totally for about 30 days, or doing one lane at a time, taking considerably longer.
The 18 mile detour is from one side of channel to the other: rte 3 to Rollercoaster Rd to rte 106 to Elm st to rte 3.
Considering it is a year and a half away, there was a good amount of detail, IMHO.
Dave