This dock, built in a protected cove of Lake Winnipesaukee, has seen many recent soakings, but always near the shoreline, where the size of breaking wakes rapidly increase.
If I'd built on the Broads, I'd have longer pilings put underneath—and a breakwater—which is not permitted here on a deep and a "protected" shoreline. Since 1984, moorings and boatlifts have sprung up in Winter Harbor like mushrooms in July, so the problem of oversized boats isn't being overlooked.
Ocean-racers and "liveaboard" cruisers aren't so much of a problem
on oceans.
Good point!
Most here hadn't thought to look beyond the obvious.
In
1984, the builders didn't think to use PT for the 6"x8" cross-members, so I've had to replace three of them myself—most recently last summer.
As it happened, a 6"x8" cross-member floated-by last spring. Although twice as long as needed, I snagged it, and chain-sawed it to fit.