Quote:
Originally Posted by LongBay
The original building plan looks entirely different than the final product. A typical move by a business owner who knows their actual plan will never get approved if they present it to town officials and neighbors when they are trying to get the green light on a project. What a shame the town planners approved the modified plan, they should have made Lakeport stick to the original rendition presented to the community.
|
The original was not a plan- it was the rendering of a conceptual design. That conceptual design went through numerous changes until 100% CDs or construction documents were completed. The 100% CDs were then submitted to the city as a permit set.