View Single Post
Old 01-23-2020, 11:00 PM   #18
jazzman
Senior Member
 
Join Date: Jul 2011
Location: Mont Vernon NH & Big Barndoor Island
Posts: 320
Thanks: 4
Thanked 184 Times in 62 Posts
Default

Post and beam is a challenge for contractors. They hate them because everything is a little different. Plumbing and electrical is a challenge if you have 2 floors. The posts shrink and mess up floors and walls. Benson is a good choice but probably $250+ per square foot.
jazzman is offline   Reply With Quote