View Single Post
Old 05-26-2020, 02:16 PM   #91
bobkatfly
Senior Member
 
bobkatfly's Avatar
 
Join Date: Aug 2015
Location: Mirror Lake/Winter Harbor
Posts: 303
Thanks: 47
Thanked 49 Times in 43 Posts
Default

Quote:
Originally Posted by bobkatfly View Post
New roof is on, lots of work going on inside. Sign outside says opening soon. Don't have an actual date though. Been meaning to stop and ask but they haven't been outside when I'm going by. I'll post if I hear.
So, I've been by the store a number of times and haven't seen anyone outside. Seems to be primarily inside work. Drove by slow today and from what I saw through the windows, they seem far away from being finished. Also, the rooftop AC units are still on the ground in crates. Could be mid to late summer unless they open the outside service window for limited (ice cream) items. With the gas pumps open, that would make sense so as to give us all some hope while they finish. Next time I'm by I'll try talking to the pump attendant although I'm sure he's been asked already and maybe sworn to secrecy.
__________________
Bob F

Amherst till the big 66 comes (made it!)
Winter Harbor/Mirror Lake till the big guy comes
bobkatfly is offline   Reply With Quote
The Following User Says Thank You to bobkatfly For This Useful Post: