Quote:
Originally Posted by SAMIAM
Am I understanding this correctly? All those months of work and a lot of money spent and nothing has changed except new curbs and a crosswalk.
|
Seems like there was quite a bit of work necessary on the bridge over the water that drains from Waukewan. They dug up and replaced all the surface down to the support structure. Not sure what necessitated that. Also work on 25 in front of the bank. Drains?
Except for the crosswalk, this doesn't seem to have been meant to be a "fix" for traffic issues. Mostly repairs to existing road/bridge/drainage systems.