View Single Post
Old 03-31-2019, 09:33 AM   #33
Rusty
Senior Member
 
Join Date: Oct 2010
Posts: 2,028
Thanks: 603
Thanked 687 Times in 425 Posts
Default

Quote:
Originally Posted by Lakegeezer View Post
For those interested in more history of this situation, look at the Moultonboro's GIS system at https://www.axisgis.com/moultonboroughNH/ - Search for Corr, select the property, then click on documents and links. There are building permits, zoning board decisions, variance applications and DES correspondence.

While the location change is well documented and ZB approved, I'm left wondering where the "changes in configuration, construction type or dimensions in accordance with plans dated 11/2/15" were approved. The variance application and new building permit, dated 5/25/16 references the original building permit and raises the estimated cost but has no hint of a multi-level structure.

Unless the building is longer, which the pictures imply it may be, there shouldn't be greater impact to water quality from roof runoff. Hopefully the supreme court will focus on confirming the building was built as approved.
I went to the GIS site last week and that is where I saw the .pdf files which (to me) aren't clear as to why the DES overruled the wet lands and zoning approvals of the building.
The flow is confusing to my old brain.
__________________
It's never crowded along the extra mile.
Rusty is offline   Reply With Quote