Hemlockpoint - Your project is if far enough along that you would be ok under every version of proposed rule, law, and policy that I've seen thus far. If your primary structure (house) foundation is in and your driveway is roughed in before April 1 then completing those structures is not going to require anything new from DES. From what we've seen so far, if a problem were to arise it would be in relation to outbuildings or not building according to the plan approved by the original building permit. If your primary structure and driveway (gravel by law is considered impervious unless specially designed and laid down) put your property at or above the new impervious surface limits, then after the date the new law takes effect, initiating construction of any new structures, such as a garage, even though they were covered by the local building permit, may still be illegal. The other thing is that you will likely only be covered for those things specifically permitted on the local building permit you are operating under. If you don't build according to the plans sent to the municipality or the permit is vague and no plans were required, then you may not be covered by any vesting provision.
Onshore is offline   Reply With Quote