Quote:
Originally Posted by Gatto Nero
Actually, The waiting period is only 10 calendar days, if the PBN Form contains a waiver of intervention (signature) from the Conservation Commission.
|
Good point. I was aware that a Conservation Commission's "waiver of intervention" reduced the PBN waiting period to 10 calendar days, but I didn't realize that the definition of "waiver of intervention" was simply a signature!

Thanks for the clarification.