View Single Post
Old 05-17-2012, 01:36 PM   #17
Onshore
Senior Member
 
Join Date: Apr 2004
Posts: 502
Thanks: 12
Thanked 423 Times in 145 Posts
Default

You will need to to have the leachfield looked at to determine is the system can handle the additional loading. If you can get approval from the Subsurface Systems Bureau then Shoreland should not be a problem.
Onshore is offline   Reply With Quote