Go Back   Winnipesaukee Forum > Blogs > Broome Building Co.
Home Forums Gallery Blogs YouTube Channel Classifieds Links Calendar Register FAQDonate Members List Search Today's Posts Mark Forums Read

» Site Navigation
» Quiz
» WeirsCAM
» Articles - Information
» Recent Forum Threads
dinner reccomendation,...
Today 10:23 AM
Last post by newposterguy
Today 10:23 AM
0 Replies, 1 Views
Pier 19
06-09-2019 05:32 PM
by KPW
Last post by LIforrelaxin
Today 10:11 AM
56 Replies, 5,449 Views
Encourage Children...
Yesterday 04:58 PM
Last post by eillac@dow
Today 09:55 AM
9 Replies, 310 Views
Stuck in Back Bay
07-16-2019 04:55 PM
Last post by Wifi-1
Today 09:54 AM
22 Replies, 1,348 Views
Lost & found on lake
Yesterday 01:21 PM
Last post by lakershaker
Today 09:01 AM
3 Replies, 434 Views
» Made in USA
Rate this Entry

Geothermal Design - Installation

Submit "Geothermal Design - Installation" to Facebook Submit "Geothermal Design - Installation" to Digg Submit "Geothermal Design - Installation" to Google Submit "Geothermal Design - Installation" to Twitter
Posted 10-13-2011 at 05:56 AM by Broome Building Co.
Updated 10-14-2011 at 06:55 PM by Broome Building Co.

When considering the installation of a new heating system give geothermal a look. With today's federal and local rebates, it can actually cost less to go with a geothermal heating system rather than the best propane or oil system. Benefits include minimal reliance on fossil fuels, cleanest energy available and a typical fuel savings annually of 50%.


To give those interested a better understanding of Geothermal Heating, I have decided to offer a look into this technology and its benefits. The featured home is a new 2 story, 1800 square foot home being constructed with optimum energy efficiency in mind here in the Lakes Region.

Step 1. System Design: The design of a geothermal heating system is specific to each individual home. Windows, doors, insulation r-values and the building envelope are important features to consider when designing a system.


Design Summary: Lakes Region Home

Design Data:

Heating Load: 37,500 Btuh

Heating Temp Diff: 65.0 F

Cooling Load: 24,000 Btuh

Cooling Temp Diff: 20.0 F

Constant Fan: No

Design City: GREEN BAY, WI

Winter Design: -9 F

Summer Design: 88 F


Comfort Conditions:

Heating Setpoint: 60 F

Cooling Setpoint: 72 F

Start Cooling Temp: 72 F


Annual Load:

Heating: 58.5 million Btu

Cooling: 12.0 million Btu


Performance Summary


Heating Electrical Use: 4,768 kWh

Cooling Electrical Use: 355 kwh

Estimated annual energy use: $1262.00


As the installation progresses, I will post photos of Step 2. The Installation, to this Blog
Posted in Uncategorized
Share Views 2274 Comments 0
« Prev     Main     Next »
Total Comments 0

Comments

 

Powered by vBadvanced CMPS v3.2.3

All times are GMT -5. The time now is 10:32 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2019, vBulletin Solutions Inc.

This page was generated in 0.33600 seconds