#1 |
|
Senior Member
Join Date: Apr 2004
Posts: 350
Thanks: 28
Thanked 58 Times in 29 Posts
|
Just a word of warning for those of you that use I-93 North to get to the lake. There is new bridge work being done on 3-4 bridges just before exit 20. They have cut it down to one-lane for a couple of miles. It is bound to cause some major backups on Fridays. Don't know how long they will be there but it looks like it will be awhile since they repainted the traffic lines. Good news is that this good weather must have given them a chance to start a little early.
Best of luck |
|
|
|
|
|
#2 |
|
Senior Member
Join Date: Apr 2004
Posts: 3,719
Thanks: 159
Thanked 477 Times in 267 Posts
|
Went through yesterday. Don't understand why cars are driving only 30 mph in a 55.
__________________
SIKSUKR |
|
|
|
|
|
#3 | |
|
Senior Member
Join Date: Apr 2004
Location: Belmont NH but prefer Jackman Maine
Posts: 1,836
Thanks: 484
Thanked 402 Times in 247 Posts
|
Quote:
![]() Same reason they slow down to gawk at an accident scene. ![]() When you figure out why let the rest of us know
__________________
"better to have a short life that is full of what you like doing, then a long life spent in a miserable way.."
|
|
|
|
|
|
|
#4 |
|
Senior Member
Join Date: Jul 2008
Location: West side Winnipesaukee, Lakes Region
Posts: 490
Thanks: 20
Thanked 51 Times in 39 Posts
|
Not a big deal today....... Just keep going.
|
|
|
|
|
|
#5 |
|
Senior Member
Join Date: Aug 2009
Location: Moultonborough
Posts: 158
Thanks: 12
Thanked 134 Times in 38 Posts
|
Not only is the construction in the northbound lanes, but it is also on the southbound side in the same general area. We got stuck for almost a half hour on Friday night northbound. There was little evidence of any excavation going on...maybe three wheel barrows of material in a pile. On the southbound side, there was nothing going on through Saturday night except a mile or so of barrels blocking one lane and a short stretch of Jersey barriers. This is going to be a real headache in both directions until it gets completed and there isn't a real good alternative. Any idea how long this is going to be under construction.
|
|
|
|
| Sponsored Links |
|
|
|
|
#6 | |
|
Senior Member
Join Date: Dec 2010
Location: Winnisquam, NH
Posts: 464
Thanks: 340
Thanked 114 Times in 81 Posts
|
Quote:
Interstate 93 in both directions: from after NH 132 to before Exit 20: US 3 construction work, roadway reduced to one lane — until July 26, 2013 Comment: Bureau of Construction project. This project consists of 2.5 miles of pavement rehabilitation and bridge rehabilitation work on 6 bridges in the Town of Northfield. The work begins at mile marker 53.0 and ends at mile marker 56.0. The roadway is reduced to one lane until May 18, 2012, when it will be opened up to the normal two lanes.
__________________
"I'd rather be ridin than rolling" |
|
|
|
|
![]() |