Asloren is correct. Before we tore down our old house and built a new house we had the property surveyed. The survey showed the building envelope where we could build in compliance with Town and State rules and the possible location of a new well and septic. That plan was then sent to our architect in a format where he could design and locate what we wanted. It made it easy to tweak the location and design process.
|