View Single Post
Old 03-27-2012, 05:51 AM   #6
Winnisquamguy
Senior Member
 
Winnisquamguy's Avatar
 
Join Date: Dec 2010
Location: Winnisquam, NH
Posts: 613
Thanks: 419
Thanked 163 Times in 115 Posts
Default

Quote:
Originally Posted by tummyman View Post
Not only is the construction in the northbound lanes, but it is also on the southbound side in the same general area. We got stuck for almost a half hour on Friday night northbound. There was little evidence of any excavation going on...maybe three wheel barrows of material in a pile. On the southbound side, there was nothing going on through Saturday night except a mile or so of barrels blocking one lane and a short stretch of Jersey barriers. This is going to be a real headache in both directions until it gets completed and there isn't a real good alternative. Any idea how long this is going to be under construction.
I found this on NH DOT website, hope it helps.

Interstate 93 in both directions: from after NH 132 to before Exit 20: US 3
construction work, roadway reduced to one lane — until July 26, 2013
Comment: Bureau of Construction project. This project consists of 2.5 miles of pavement rehabilitation and bridge rehabilitation work on 6 bridges in the Town of Northfield. The work begins at mile marker 53.0 and ends at mile marker 56.0. The roadway is reduced to one lane until May 18, 2012, when it will be opened up to the normal two lanes.
__________________
"I'd rather be ridin than rolling"
Winnisquamguy is offline   Reply With Quote
The Following 2 Users Say Thank You to Winnisquamguy For This Useful Post: