View Single Post
Old 02-03-2024, 07:52 AM   #38
smith point boater
Senior Member
 
Join Date: Apr 2004
Location: West Alton,NH
Posts: 197
Thanks: 328
Thanked 92 Times in 51 Posts
Default Infrastructure

Knowing little about the proposed project (which I would be against) first brings to mind some more basic questions about that area of West Alton.

- Could Cherry Valley Road (11A) even handle the short term increase in heavy equipment traffic this project will bring and who would pay for the road repairs in the end

- Could Cherry Valley Rd handle the long term increase in vehicle traffic

- Would this project ultimately lead to never ending traffic jams

- Is Cherry Valley Rd capable of having turn lanes etc that will be needed long term to alleviate traffic problems

- Will the town (the tax payers ) be required to install traffic lights at Mt Major Highway (Rte 11) and Cherry Valley Rd to handle inflow/outflow of traffic

I just see the town and ultimately the tax payers paying the price for this project and the headaches that will come with it

Just a few thoughts
smith point boater is offline   Reply With Quote
The Following 3 Users Say Thank You to smith point boater For This Useful Post: